ITAC Assessment: MA0243
ITAC logo
ITAC Assessment: MA0243
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product HEAVY MACHINERY
NAICS
n/a
SIC 3559: Special Industry Machinery, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 150
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,290
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $226,535 2,235,053
kWh
Natural Gas $77,754 14,889
MMBtu
Fuel Oil #6 $53,544 15,034
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $48,197 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $39,134

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings Fuel Oil #6 Savings Administrative Changes Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $12,894 $33 $12,894
127,198
kWh
- - - -
02 2.6124: Establish equipment maintenance schedule $11,199 $1,500 - $6,265
-
MMBtu
- $4,934
-
MMBtu
-
03 2.7226: Use computer programs to optimize hvac performance $12,146 $200 - $6,795
-
MMBtu
- $5,351
-
MMBtu
-
04 2.7423: Reduce heat gain by window tinting $5,744 $5,800 - - $3,159
-
MMBtu
$2,585
-
MMBtu
-
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $3,319 - $3,981
39,273
kWh
- - $(-662.0)
-
MMBtu
-
06 2.7261: Install timers and/or thermostats $980 $4 $980
9,672
kWh
- - - -
07 2.2113: Repair or replace steam traps $785 $1 - $776
-
MMBtu
- $609
-
MMBtu
$(-600.0)
08 2.2122: Install / repair insulation on condensate lines $365 $220 - $205
-
MMBtu
- $160
-
MMBtu
-
09 2.6232: Install set-back timers $468 $180 $468
4,689
kWh
- - - -
10 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $297 $400 $297
2,931
kWh
- - - -
TOTAL RECOMMENDED $48,197 $8,338 $18,620
183,763
kWh
$14,041
-
MMBtu
$3,159
-
MMBtu
$12,977
-
MMBtu
$(-600.0)
TOTAL IMPLEMENTED $39,134 $2,538 $14,639
144,490
kWh
$14,041
-
MMBtu
- $11,054
-
MMBtu
$(-600.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings Fuel Oil #6 Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs