Assessment Year | 1992 |
---|---|
Principal Product | RATCHET WRENCHES |
NAICS |
n/a
|
SIC | 3423: Hand and Edge Tools, Except Machine Tools and Handsaws |
Sales Range | $10 M to 50M |
# of Employees | 250 |
Plant Area |
n/a
|
Annual Production | 5,000,000
pieces
|
Production Hrs. Annual | 7,200
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $837,090 | 9,288,394 |
kWh
|
$0.090 |
Natural Gas | $334,380 | 78,872 |
MMBtu
|
$4.24 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $127,826 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $109,862 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.2444: Use hot process fluids to preheat incoming process fluids | $83,013 | $80 |
$(-19,068.0)
(-211,606)
kWh
|
$32,503
-
MMBtu
|
$69,578 | |
02 | 2.2437: Recover waste heat from equipment | $17,964 | $55,605 |
$(-3,486.0)
(-38,687)
kWh
|
$21,450
-
MMBtu
|
- | |
03 | 2.1221: Replace obsolete burners with more efficient ones | $16,723 | $11 | - |
$16,723
-
MMBtu
|
- | |
04 | 2.4221: Install compressor air intakes in coolest locations | $3,460 | $2,355 |
$3,460
38,394
kWh
|
- | - | |
05 | 2.7221: Lower temperature during the winter season and vice-versa | $2,896 | - | - |
$2,896
-
MMBtu
|
- | |
06 | 2.6232: Install set-back timers | $1,400 | $400 |
$1,400
15,533
kWh
|
- | - | |
07 | 2.2113: Repair or replace steam traps | $1,348 | $240 | - |
$1,348
-
MMBtu
|
- | |
08 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $1,022 | $2,200 | - |
$1,022
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $127,826 | $60,891 |
$(-17,694.0)
(-196,366)
kWh
|
$75,942
-
MMBtu
|
$69,578 | ||
TOTAL IMPLEMENTED | $109,862 | $5,286 |
$(-14,208.0)
(-157,679)
kWh
|
$54,492
-
MMBtu
|
$69,578 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs