| Assessment Year | 1992 |
|---|---|
| Principal Product | ALLERGIC DIAGNOSTIC SETS |
| NAICS |
n/a
|
| SIC | 2835: In Vitro and In Vivo Diagnostic Substances |
| Sales Range | $10 M to 50M |
| # of Employees | 125 |
| Plant Area |
n/a
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 2,340
hrs
|
| Location (State) | Maine |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $141,846 | 1,646,542 |
kWh
|
$0.086 |
| Fuel Oil #2 | $1,455 | 293 |
MMBtu
|
$4.97 |
| Other Energy | $21,552 | 2,867 |
MMBtu
|
$7.52 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $19,554 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $18,106 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #2 Savings | Other Energy Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7229: Air condition only space necessary | $6,633 | - |
$2,172
25,205
kWh
|
$4,461
-
MMBtu
|
- | |
| 02 | 2.4321: Upgrade obsolete equipment | $5,505 | $61,500 |
$5,505
63,892
kWh
|
- | - | |
| 03 | 2.1392: Replace purchased steam with other energy source | $4,762 | $75 | - |
$(-16,798.0)
-
MMBtu
|
$21,560
-
MMBtu
|
|
| 04 | 2.6242: Minimize operation of equipment maintained in standby condition | $1,145 | - |
$740
8,499
kWh
|
$405
-
MMBtu
|
- | |
| 05 | 2.7261: Install timers and/or thermostats | $1,206 | $1,265 |
$280
3,224
kWh
|
$926
-
MMBtu
|
- | |
| 06 | 2.4221: Install compressor air intakes in coolest locations | $303 | $386 |
$303
3,517
kWh
|
- | - | |
| TOTAL RECOMMENDED | $19,554 | $63,226 |
$9,000
104,337
kWh
|
$(-11,006.0)
-
MMBtu
|
$21,560
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $18,106 | $62,840 |
$7,957
92,321
kWh
|
$(-11,411.0)
-
MMBtu
|
$21,560
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Fuel Oil #2 Savings | Other Energy Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs