ITAC Assessment: MA0239
ITAC logo
ITAC Assessment: MA0239
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product ALLERGIC DIAGNOSTIC SETS
NAICS
n/a
SIC 2835: In Vitro and In Vivo Diagnostic Substances
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,340
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $141,846 1,646,542
kWh
Fuel Oil #2 $1,455 293
MMBtu
Other Energy $21,552 2,867
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,554 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,106

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings Other Energy Savings
01 2.7229: Air condition only space necessary $6,633 - $2,172
25,205
kWh
$4,461
-
MMBtu
-
02 2.4321: Upgrade obsolete equipment $5,505 $61,500 $5,505
63,892
kWh
- -
03 2.1392: Replace purchased steam with other energy source $4,762 $75 - $(-16,798.0)
-
MMBtu
$21,560
-
MMBtu
04 2.6242: Minimize operation of equipment maintained in standby condition $1,145 - $740
8,499
kWh
$405
-
MMBtu
-
05 2.7261: Install timers and/or thermostats $1,206 $1,265 $280
3,224
kWh
$926
-
MMBtu
-
06 2.4221: Install compressor air intakes in coolest locations $303 $386 $303
3,517
kWh
- -
TOTAL RECOMMENDED $19,554 $63,226 $9,000
104,337
kWh
$(-11,006.0)
-
MMBtu
$21,560
-
MMBtu
TOTAL IMPLEMENTED $18,106 $62,840 $7,957
92,321
kWh
$(-11,411.0)
-
MMBtu
$21,560
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #2 Savings Other Energy Savings