| Assessment Year | 2003 |
|---|---|
| Principal Product | FURNITURE VENEER |
| NAICS | 321211: Hardwood Veneer and Plywood Manufacturing |
| SIC | 2435: Hardwood Veneer and Plywood |
| Sales Range | $1 M to 5M |
| # of Employees | 40 |
| Plant Area |
n/a
|
| Annual Production | 22,500,000
thousand feet
|
| Production Hrs. Annual | 4,500
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $21,285 | 825,000 |
kWh
|
$0.026 |
| Electricity Demand | $45,582 | 3,622 |
kW-mo/yr
|
$12.58 |
| Natural Gas | $90,879 | 161,893 |
MMBtu
|
$0.56 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $86,520 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $12,100 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Energy Savings | Water Consumption Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.1231: Establish burner maintenance schedule for boilers | $3,130 | - | - | - |
$3,130
-
MMBtu
|
- | - | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,790 | $1,300 |
$2,650
96,010
kWh
|
$3,140
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $940 | $1,106 |
$350
12,808
kWh
|
$590
-
kW-mo/yr
|
- | - | - | |
| 04 | 2.4239: Eliminate or reduce compressed air usage | $3,180 | $6,000 |
$870
31,400
kWh
|
$2,310
-
kW-mo/yr
|
- | - | - | |
| 05 | 2.2163: Use minimum steam operating pressure | $750 | - | - | - |
$750
-
MMBtu
|
- | - | |
| 06 | 2.4312: Improve lubrication practices | $320 | - |
$130
4,700
kWh
|
$190
-
kW-mo/yr
|
- | - | - | |
| 07 | 3.4113: Treat and reuse rinse waters | $1,775 | $5,450 | - | - | - | - |
$1,775
-
Tgal
|
|
| 08 | 2.2136: Install / repair insulation on steam lines | $420 | $460 | - | - |
$420
-
MMBtu
|
- | - | |
| 09 | 2.2135: Repair and eliminate steam leaks | $1,155 | $300 | - | - |
$1,155
-
MMBtu
|
- | - | |
| 10 | 2.1331: Burn a less expensive grade of fuel | $61,630 | $250,000 | - | - |
$61,630
-
MMBtu
|
- | - | |
| 11 | 2.4134: Replace electric motor with fossil fuel engine | $7,430 | $12,000 |
$5,170
186,975
kWh
|
$12,250
-
kW-mo/yr
|
- |
$(-9,990.0)
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $86,520 | $276,616 |
$9,170
331,893
kWh
|
$18,480
-
kW-mo/yr
|
$67,085
-
MMBtu
|
$(-9,990.0)
-
MMBtu
|
$1,775
-
Tgal
|
||
| TOTAL IMPLEMENTED | $12,100 | $7,300 |
$3,520
127,410
kWh
|
$5,450
-
kW-mo/yr
|
$3,130
-
MMBtu
|
- | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Energy Savings | Water Consumption Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs