ITAC Assessment: GT0765
ITAC logo
ITAC Assessment: GT0765
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product FURNITURE VENEER
NAICS 321211: Hardwood Veneer and Plywood Manufacturing
SIC 2435: Hardwood Veneer and Plywood
Sales Range $1
M
to 5
M
# of Employees 40
Plant Area
n/a
Annual Production 22,500,000
thousand feet
Production Hrs. Annual 4,500
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $21,285 825,000
kWh
Electricity Demand $45,582 3,622
kW-mo/yr
Natural Gas $90,879 161,893
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $86,520 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,100

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Energy Savings Water Consumption Savings
01 2.1231: Establish burner maintenance schedule for boilers $3,130 - - - $3,130
-
MMBtu
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,790 $1,300 $2,650
96,010
kWh
$3,140
-
kW-mo/yr
- - -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $940 $1,106 $350
12,808
kWh
$590
-
kW-mo/yr
- - -
04 2.4239: Eliminate or reduce compressed air usage $3,180 $6,000 $870
31,400
kWh
$2,310
-
kW-mo/yr
- - -
05 2.2163: Use minimum steam operating pressure $750 - - - $750
-
MMBtu
- -
06 2.4312: Improve lubrication practices $320 - $130
4,700
kWh
$190
-
kW-mo/yr
- - -
07 3.4113: Treat and reuse rinse waters $1,775 $5,450 - - - - $1,775
-
Tgal
08 2.2136: Install / repair insulation on steam lines $420 $460 - - $420
-
MMBtu
- -
09 2.2135: Repair and eliminate steam leaks $1,155 $300 - - $1,155
-
MMBtu
- -
10 2.1331: Burn a less expensive grade of fuel $61,630 $250,000 - - $61,630
-
MMBtu
- -
11 2.4134: Replace electric motor with fossil fuel engine $7,430 $12,000 $5,170
186,975
kWh
$12,250
-
kW-mo/yr
- $(-9,990.0)
-
MMBtu
-
TOTAL RECOMMENDED $86,520 $276,616 $9,170
331,893
kWh
$18,480
-
kW-mo/yr
$67,085
-
MMBtu
$(-9,990.0)
-
MMBtu
$1,775
-
Tgal
TOTAL IMPLEMENTED $12,100 $7,300 $3,520
127,410
kWh
$5,450
-
kW-mo/yr
$3,130
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Energy Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs