| Assessment Year | 1991 |
|---|---|
| Principal Product | NAIL,METAL FASTENERS,ETC |
| NAICS |
n/a
|
| SIC | 3315: Steel Wiredrawing and Steel Nails and Spikes |
| Sales Range | $5 M to 10M |
| # of Employees | 75 |
| Plant Area |
n/a
|
| Annual Production | 2,500,000
lb
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | New Hampshire |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $124,996 | 1,397,128 |
kWh
|
$0.089 |
| Fuel Oil #6 | $79,529 | 22,750 |
MMBtu
|
$3.50 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $19,935 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $2,888 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #6 Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.1223: Install smaller boiler (increase high fire duty cycle) | $8,474 | $43,800 | - |
$8,474
-
MMBtu
|
- | |
| 02 | 2.7226: Use computer programs to optimize hvac performance | $5,481 | $11,200 | - |
$5,481
-
MMBtu
|
- | |
| 03 | 2.2136: Install / repair insulation on steam lines | $1,764 | $2,625 | - |
$1,764
-
MMBtu
|
- | |
| 04 | 2.6232: Install set-back timers | $1,367 | $660 |
$1,367
15,240
kWh
|
- | - | |
| 05 | 2.2113: Repair or replace steam traps | $970 | $970 | - |
$1,908
-
MMBtu
|
$(-938.0) | |
| 06 | 2.2511: Insulate bare equipment | $987 | $689 | - |
$987
-
MMBtu
|
- | |
| 07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $551 | - |
$551
6,155
kWh
|
- | - | |
| 08 | 2.4221: Install compressor air intakes in coolest locations | $341 | $550 |
$341
3,810
kWh
|
- | - | |
| TOTAL RECOMMENDED | $19,935 | $60,494 |
$2,259
25,205
kWh
|
$18,614
-
MMBtu
|
$(-938.0) | ||
| TOTAL IMPLEMENTED | $2,888 | $1,630 |
$1,918
21,395
kWh
|
$1,908
-
MMBtu
|
$(-938.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Fuel Oil #6 Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs