ITAC Assessment: MA0225
ITAC logo
ITAC Assessment: MA0225
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product NAIL,METAL FASTENERS,ETC
NAICS
n/a
SIC 3315: Steel Wiredrawing and Steel Nails and Spikes
Sales Range $5
M
to 10
M
# of Employees 75
Plant Area
n/a
Annual Production 2,500,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $124,996 1,397,128
kWh
Fuel Oil #6 $79,529 22,750
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,935 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,888

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #6 Savings Administrative Changes Savings
01 2.1223: Install smaller boiler (increase high fire duty cycle) $8,474 $43,800 - $8,474
-
MMBtu
-
02 2.7226: Use computer programs to optimize hvac performance $5,481 $11,200 - $5,481
-
MMBtu
-
03 2.2136: Install / repair insulation on steam lines $1,764 $2,625 - $1,764
-
MMBtu
-
04 2.6232: Install set-back timers $1,367 $660 $1,367
15,240
kWh
- -
05 2.2113: Repair or replace steam traps $970 $970 - $1,908
-
MMBtu
$(-938.0)
06 2.2511: Insulate bare equipment $987 $689 - $987
-
MMBtu
-
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $551 - $551
6,155
kWh
- -
08 2.4221: Install compressor air intakes in coolest locations $341 $550 $341
3,810
kWh
- -
TOTAL RECOMMENDED $19,935 $60,494 $2,259
25,205
kWh
$18,614
-
MMBtu
$(-938.0)
TOTAL IMPLEMENTED $2,888 $1,630 $1,918
21,395
kWh
$1,908
-
MMBtu
$(-938.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #6 Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs