ITAC Assessment: MA0223
ITAC logo
ITAC Assessment: MA0223
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product PRECISION MACHINING
NAICS
n/a
SIC 3544: Special Dies and Tools, Die Sets, Jigs and Fixtures, and Industrial Molds
Sales Range $5
M
to 10
M
# of Employees 75
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 6,288
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $92,973 1,127,784
kWh
Natural Gas $2,635 353
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,627 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,230

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7447: Install vinyl strip / high speed / air curtain doors $3,884 $1,100 - $3,884
-
MMBtu
-
02 2.6232: Install set-back timers $2,810 $220 $2,810
34,291
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $399 $11,600 $1,071
13,189
kWh
- $(-672.0)
04 2.6232: Install set-back timers $532 $265 $532
6,448
kWh
- -
05 2.2437: Recover waste heat from equipment $2,144 $600 - $2,144
-
MMBtu
-
06 2.7229: Air condition only space necessary $968 $100 $48
586
kWh
$920
-
MMBtu
-
07 2.3212: Optimize plant power factor $721 $1,495 $721
8,792
kWh
- -
08 2.4221: Install compressor air intakes in coolest locations $169 $100 $169
2,052
kWh
- -
TOTAL RECOMMENDED $11,627 $15,480 $5,351
65,358
kWh
$6,948
-
MMBtu
$(-672.0)
TOTAL IMPLEMENTED $8,230 $13,120 $4,098
50,118
kWh
$4,804
-
MMBtu
$(-672.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs