| Assessment Year | 1991 |
|---|---|
| Principal Product | PRECISION MACHINING |
| NAICS |
n/a
|
| SIC | 3544: Special Dies and Tools, Die Sets, Jigs and Fixtures, and Industrial Molds |
| Sales Range | $5 M to 10M |
| # of Employees | 75 |
| Plant Area |
n/a
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 6,288
hrs
|
| Location (State) | Massachusetts |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $92,973 | 1,127,784 |
kWh
|
$0.082 |
| Natural Gas | $2,635 | 353 |
MMBtu
|
$7.46 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $11,627 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $8,230 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7447: Install vinyl strip / high speed / air curtain doors | $3,884 | $1,100 | - |
$3,884
-
MMBtu
|
- | |
| 02 | 2.6232: Install set-back timers | $2,810 | $220 |
$2,810
34,291
kWh
|
- | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $399 | $11,600 |
$1,071
13,189
kWh
|
- | $(-672.0) | |
| 04 | 2.6232: Install set-back timers | $532 | $265 |
$532
6,448
kWh
|
- | - | |
| 05 | 2.2437: Recover waste heat from equipment | $2,144 | $600 | - |
$2,144
-
MMBtu
|
- | |
| 06 | 2.7229: Air condition only space necessary | $968 | $100 |
$48
586
kWh
|
$920
-
MMBtu
|
- | |
| 07 | 2.3212: Optimize plant power factor | $721 | $1,495 |
$721
8,792
kWh
|
- | - | |
| 08 | 2.4221: Install compressor air intakes in coolest locations | $169 | $100 |
$169
2,052
kWh
|
- | - | |
| TOTAL RECOMMENDED | $11,627 | $15,480 |
$5,351
65,358
kWh
|
$6,948
-
MMBtu
|
$(-672.0) | ||
| TOTAL IMPLEMENTED | $8,230 | $13,120 |
$4,098
50,118
kWh
|
$4,804
-
MMBtu
|
$(-672.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs