ITAC Assessment: MA0192
ITAC logo
ITAC Assessment: MA0192
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product SMALL PLASTICS PARTS
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 41
Plant Area
n/a
Annual Production 500,000
lb
Production Hrs. Annual 6,120
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $143,693 1,832,943
kWh
Natural Gas $11,998 1,586
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,650 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,318

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $2,182 $2,878 $2,182
27,843
kWh
-
02 2.7261: Install timers and/or thermostats $4,701 $4,950 $4,020
51,290
kWh
$681
-
MMBtu
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,493 $40,000 $1,493
19,050
kWh
-
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,150 - $2,150
-
kWh
-
05 2.6232: Install set-back timers $1,214 $732 $1,214
15,533
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $4,312 $942 $4,312
55,393
kWh
-
07 2.1311: Replace electrically-operated equipment with fossil fuel equipment $162 $436 $475
6,155
kWh
$(-313.0)
-
MMBtu
08 2.7261: Install timers and/or thermostats $436 $200 $436
5,569
kWh
-
TOTAL RECOMMENDED $16,650 $50,138 $16,282
180,833
kWh
$368
-
MMBtu
TOTAL IMPLEMENTED $12,318 $47,260 $11,950
152,990
kWh
$368
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs