Assessment Year | 1990 |
---|---|
Principal Product | SMALL PLASTICS PARTS |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $1 M to 5M |
# of Employees | 41 |
Plant Area |
n/a
|
Annual Production | 500,000
lb
|
Production Hrs. Annual | 6,120
hrs
|
Location (State) | Connecticut |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $143,693 | 1,832,943 |
kWh
|
$0.078 |
Natural Gas | $11,998 | 1,586 |
MMBtu
|
$7.56 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $16,650 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $12,318 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7228: Avoid introducing hot, humid, or dirty air into hvac system | $2,182 | $2,878 |
$2,182
27,843
kWh
|
- | |
02 | 2.7261: Install timers and/or thermostats | $4,701 | $4,950 |
$4,020
51,290
kWh
|
$681
-
MMBtu
|
|
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,493 | $40,000 |
$1,493
19,050
kWh
|
- | |
04 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $2,150 | - |
$2,150
-
kWh
|
- | |
05 | 2.6232: Install set-back timers | $1,214 | $732 |
$1,214
15,533
kWh
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,312 | $942 |
$4,312
55,393
kWh
|
- | |
07 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $162 | $436 |
$475
6,155
kWh
|
$(-313.0)
-
MMBtu
|
|
08 | 2.7261: Install timers and/or thermostats | $436 | $200 |
$436
5,569
kWh
|
- | |
TOTAL RECOMMENDED | $16,650 | $50,138 |
$16,282
180,833
kWh
|
$368
-
MMBtu
|
||
TOTAL IMPLEMENTED | $12,318 | $47,260 |
$11,950
152,990
kWh
|
$368
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs