| Assessment Year | 1990 |
|---|---|
| Principal Product | HYDRONIC HEATING PRODUCT |
| NAICS |
n/a
|
| SIC | 3443: Fabricated Plate Work (Boiler Shops) |
| Sales Range | $10 M to 50M |
| # of Employees | 255 |
| Plant Area |
n/a
|
| Annual Production | 10,500,000
lb
|
| Production Hrs. Annual | 4,250
hrs
|
| Location (State) | Massachusetts |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $153,424 | 1,589,097 |
kWh
|
$0.097 |
| Natural Gas | $54,725 | 15,475 |
MMBtu
|
$3.54 |
| Fuel Oil #2 | $12,927 | 4,060 |
MMBtu
|
$3.18 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $10,591 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $7,438 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7492: Use proper thickness of insulation on building envelope | $5,921 | $116,600 | - |
$3,119
-
MMBtu
|
$2,802
-
MMBtu
|
|
| 02 | 2.6232: Install set-back timers | $368 | $440 |
$368
3,810
kWh
|
- | - | |
| 03 | 2.4221: Install compressor air intakes in coolest locations | $678 | $336 |
$678
7,034
kWh
|
- | - | |
| 04 | 2.2511: Insulate bare equipment | $644 | $1,540 | - |
$644
-
MMBtu
|
- | |
| 05 | 2.7226: Use computer programs to optimize hvac performance | $471 | $675 |
$471
4,982
kWh
|
- | - | |
| 06 | 2.7314: Reduce ventilation air | $2,509 | $500 |
$396
4,103
kWh
|
$2,113
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $10,591 | $120,091 |
$1,913
19,929
kWh
|
$5,876
-
MMBtu
|
$2,802
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $7,438 | $118,051 |
$1,517
15,826
kWh
|
$3,119
-
MMBtu
|
$2,802
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs