ITAC Assessment: MA0173
ITAC logo
ITAC Assessment: MA0173
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product TEFLON COATED FABRICS
NAICS
n/a
SIC 2295: Coated Fabrics, Not Rubberized
Sales Range $10
M
to 50
M
# of Employees 73
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 8,568
hrs
Location (State) Vermont

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $173,862 2,321,805
kWh
LPG $308,376 90,520
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,386 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,386

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,734 - $1,734
23,154
kWh
-
02 2.4221: Install compressor air intakes in coolest locations $758 $354 $758
10,258
kWh
-
03 2.6232: Install set-back timers $350 $231 $350
4,689
kWh
-
04 2.2511: Insulate bare equipment $10,347 $10,784 - $10,347
-
MMBtu
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,197 $1,500 $1,254
4,396
kWh
$(-57.0)
-
MMBtu
TOTAL RECOMMENDED $14,386 $12,869 $4,096
42,497
kWh
$10,290
-
MMBtu
TOTAL IMPLEMENTED $14,386 $12,869 $4,096
42,497
kWh
$10,290
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs