Assessment Year | 1990 |
---|---|
Principal Product | SHAMPOO & CONDITIONER |
NAICS |
n/a
|
SIC | 2844: Perfumes, Cosmetics, and Other Toilet Preparations |
Sales Range | $100 M to 500M |
# of Employees | 272 |
Plant Area |
n/a
|
Annual Production | 15,000,000
pieces
|
Production Hrs. Annual | 4,125
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $233,609 | 3,456,038 |
kWh
|
$0.068 |
Natural Gas | $101,403 | 28,561 |
MMBtu
|
$3.55 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $10,360 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $922 | $575 |
$922
13,482
kWh
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $614 | $60 |
$614
9,086
kWh
|
- | |
03 | 2.6232: Install set-back timers | $396 | $195 |
$396
5,862
kWh
|
- | |
04 | 2.7229: Air condition only space necessary | $4,707 | $200 | - |
$4,707
-
MMBtu
|
|
05 | 2.2113: Repair or replace steam traps | $355 | $365 | - |
$355
-
MMBtu
|
|
06 | 2.7221: Lower temperature during the winter season and vice-versa | $119 | $150 |
$119
1,758
kWh
|
- | |
07 | 2.7226: Use computer programs to optimize hvac performance | $1,248 | $2,000 |
$1,248
18,464
kWh
|
- | |
08 | 2.7261: Install timers and/or thermostats | $1,999 | $180 | - |
$1,999
-
MMBtu
|
|
TOTAL RECOMMENDED | $10,360 | $3,725 |
$3,299
48,652
kWh
|
$7,061
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs