ITAC Assessment: MA0170
ITAC logo
ITAC Assessment: MA0170
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product SHAMPOO & CONDITIONER
NAICS
n/a
SIC 2844: Perfumes, Cosmetics, and Other Toilet Preparations
Sales Range $100
M
to 500
M
# of Employees 272
Plant Area
n/a
Annual Production 15,000,000
pieces
Production Hrs. Annual 4,125
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $233,609 3,456,038
kWh
Natural Gas $101,403 28,561
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,360 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $922 $575 $922
13,482
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $614 $60 $614
9,086
kWh
-
03 2.6232: Install set-back timers $396 $195 $396
5,862
kWh
-
04 2.7229: Air condition only space necessary $4,707 $200 - $4,707
-
MMBtu
05 2.2113: Repair or replace steam traps $355 $365 - $355
-
MMBtu
06 2.7221: Lower temperature during the winter season and vice-versa $119 $150 $119
1,758
kWh
-
07 2.7226: Use computer programs to optimize hvac performance $1,248 $2,000 $1,248
18,464
kWh
-
08 2.7261: Install timers and/or thermostats $1,999 $180 - $1,999
-
MMBtu
TOTAL RECOMMENDED $10,360 $3,725 $3,299
48,652
kWh
$7,061
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs