Assessment Year | 1989 |
---|---|
Principal Product | HARDWARE |
NAICS |
n/a
|
SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
Sales Range | $10 M to 50M |
# of Employees | 300 |
Plant Area |
n/a
|
Annual Production | 0
units
|
Production Hrs. Annual | 4,250
hrs
|
Location (State) | Connecticut |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $340,151 | 4,837,925 |
kWh
|
$0.070 |
Natural Gas | $13,015 | 2,367 |
MMBtu
|
$5.50 |
Fuel Oil #6 | $97,164 | 34,504 |
MMBtu
|
$2.82 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $27,182 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $936 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #6 Savings |
---|---|---|---|---|---|---|
01 | 2.3191: Use demand controller or load shedder | $936 | $75 |
$936
-
kWh
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $665 | $50 |
$665
9,379
kWh
|
- | |
03 | 2.3312: Install efficient rectifiers | $14,209 | $8,500 |
$14,209
202,227
kWh
|
- | |
04 | 2.4221: Install compressor air intakes in coolest locations | $1,765 | $400 |
$1,765
25,205
kWh
|
- | |
05 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $636 | $1,041 | - |
$636
-
MMBtu
|
|
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $8,259 | $14,920 |
$5,254
74,736
kWh
|
$3,005
-
MMBtu
|
|
07 | 2.6232: Install set-back timers | $712 | $150 |
$712
10,258
kWh
|
- | |
TOTAL RECOMMENDED | $27,182 | $25,136 |
$23,541
321,805
kWh
|
$3,641
-
MMBtu
|
||
TOTAL IMPLEMENTED | $936 | $75 |
$936
-
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Fuel Oil #6 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs