ITAC Assessment: MA0148
ITAC logo
ITAC Assessment: MA0148
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product MEDICAL KITS
NAICS
n/a
SIC 3842: Orthopedic, Prosthetic, and Surgical Appliances and Supplies
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area
n/a
Annual Production 3,600,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $80,235 1,032,825
kWh
Natural Gas $78,948 12,888
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,778 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,693

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.6232: Install set-back timers $155 $195 $155
2,052
kWh
- -
02 2.2113: Repair or replace steam traps $4,471 $320 - $5,271
-
MMBtu
$(-800.0)
03 2.2444: Use hot process fluids to preheat incoming process fluids $6,780 $7,000 - $6,780
-
MMBtu
-
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $2,515 $676 $4,082
52,462
kWh
$(-1,567.0)
-
MMBtu
-
05 2.7261: Install timers and/or thermostats $3,218 $2,730 - $3,218
-
MMBtu
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $726 $228 $726
9,379
kWh
- -
07 2.1131: Repair faulty insulation in furnaces, boilers, etc $3,059 $2,300 - $3,059
-
MMBtu
-
08 2.2136: Install / repair insulation on steam lines $668 $529 - $668
-
MMBtu
-
09 2.2511: Insulate bare equipment $1,186 $316 - $1,186
-
MMBtu
-
TOTAL RECOMMENDED $22,778 $14,294 $4,963
63,893
kWh
$18,615
-
MMBtu
$(-800.0)
TOTAL IMPLEMENTED $11,693 $10,145 - $11,693
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs