*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Meat and Beef Patties
NAICS 311612: Meat Processed from Carcasses
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $50
M
to 100
M
# of Employees 65
Plant Area 65,000
ft2
Annual Production 35,000,000
lb
Production Hrs. Annual 3,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $969,313 6,598,500
kWh
Natural Gas $48,840 8,092
MMBtu
Waste Disposal Costs
Water Usage $95,691 9,596,840
Tgal
Water Disposal $44,661 9,596,840
Tgal
TOTAL YEARLY COSTS $1,158,505
RECOMMENDED SAVINGS* $165,195 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,026 $5,480 $8,026
54,599
kWh
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $2,676 $60 $2,676
18,202
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $11,014 $22,363 $11,014
74,923
kWh
-
04 2.8121: Apply for tax-free status for energy purchases $52,443 $3,200 - $52,443
05 2.9114: Use solar heat to make electricty $91,036 $591,640 $91,036
619,291
kWh
-
TOTAL RECOMMENDED $165,195 $622,743 $112,752
767,015
kWh
$52,443
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs