ITAC Assessment: TT0129
ITAC logo
ITAC Assessment: TT0129
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Bottled Water
NAICS 312112: Bottled Water Manufacturing
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area 377,000
ft2
Annual Production 19,000,000
pieces
Production Hrs. Annual 6,396
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $967,251 21,554,227
kWh
Electricity Demand $550,280 41,893
kW-mo/yr
Electricity Fees $22,763 -
Natural Gas $99,808 10,970
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $115,888 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,882

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $107,559 $235,000 $5,609
124,645
kWh
- $10,250 $91,700
-
MMBtu
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,620 $2,025 $1,647
36,594
kWh
$973
-
kW-mo/yr
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,827 $3,000 $1,777
39,480
kWh
$1,050
-
kW-mo/yr
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,882 $3,000 $2,882
64,049
kWh
- - -
TOTAL RECOMMENDED $115,888 $243,025 $11,915
264,768
kWh
$2,023
-
kW-mo/yr
$10,250 $91,700
-
MMBtu
TOTAL IMPLEMENTED $2,882 $3,000 $2,882
64,049
kWh
- - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs