ITAC Assessment: UU0131
ITAC logo
ITAC Assessment: UU0131
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Milk
NAICS 311511: Fluid Milk Manufacturing
SIC 2026: Fluid Milk
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 92,000
ft2
Annual Production 60,480
units
Production Hrs. Annual 8,640
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $273,154 7,236,240
kWh
Electricity Demand $243,413 18,708
kW-mo/yr
Electricity Fees $105,560 -
Natural Gas $438,382 70,050
MMBtu
Waste Disposal Costs
Water Usage $135,420 54,540
Tgal
TOTAL YEARLY COSTS $1,195,929
RECOMMENDED SAVINGS* $382,100 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $375,599

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings
01 2.8113: Purchase gas directly from a contract gas supplier $242,000 $1,000 - - - - $242,000
02 2.8121: Apply for tax-free status for energy purchases $76,380 $1,000 - - - - $76,380
03 2.7142: Utilize higher efficiency lamps and/or ballasts $24,471 $39,272 $13,743
361,665
kWh
$6,445
-
kW-mo/yr
$4,283 - -
04 2.7135: Install occupancy sensors $17,732 $2,030 $6,576
173,047
kWh
$7,759
-
kW-mo/yr
$3,398 - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $10,477 $150 $6,459
169,982
kWh
$3,046
-
kW-mo/yr
$972 - -
06 2.2511: Insulate bare equipment $6,501 $2,665 - - - $6,501
-
MMBtu
-
07 2.7495: Install replacement doors $4,539 $300 $4,539
119,458
kWh
- - - -
TOTAL RECOMMENDED $382,100 $46,417 $31,318
824,152
kWh
$17,249
-
kW-mo/yr
$8,653 $6,501
-
MMBtu
$318,380
TOTAL IMPLEMENTED $375,599 $43,752 $31,318
824,152
kWh
$17,249
-
kW-mo/yr
$8,653 - $318,380
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs