| Assessment Year | 1989 |
|---|---|
| Principal Product | TANTALUM CAPACITORS |
| NAICS |
n/a
|
| SIC | 3675: Electronic Capacitors |
| Sales Range | $10 M to 50M |
| # of Employees | 176 |
| Plant Area |
n/a
|
| Annual Production | 20,000,000
pieces
|
| Production Hrs. Annual | 4,460
hrs
|
| Location (State) | Maine |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $226,098 | 3,953,107 |
kWh
|
$0.057 |
| Fuel Oil #2 | $15,378 | 3,910 |
MMBtu
|
$3.93 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $11,454 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $3,807 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #2 Savings |
|---|---|---|---|---|---|---|
| 01 | 2.6218: Turn off equipment when not in use | $3,559 | - |
$3,264
80,598
kWh
|
$295
-
MMBtu
|
|
| 02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $3,230 | $4,500 |
$5,380
94,080
kWh
|
$(-2,150.0)
-
MMBtu
|
|
| 03 | 2.2437: Recover waste heat from equipment | $2,036 | $4,870 | - |
$2,036
-
MMBtu
|
|
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,228 | $160 |
$1,228
21,395
kWh
|
- | |
| 05 | 2.4221: Install compressor air intakes in coolest locations | $824 | $356 |
$824
14,361
kWh
|
- | |
| 06 | 2.6218: Turn off equipment when not in use | $246 | $87 |
$246
6,155
kWh
|
- | |
| 07 | 2.6232: Install set-back timers | $206 | $525 |
$206
4,982
kWh
|
- | |
| 08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $125 | - |
$125
2,345
kWh
|
- | |
| TOTAL RECOMMENDED | $11,454 | $10,498 |
$11,273
223,916
kWh
|
$181
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $3,807 | $5,112 |
$5,957
107,562
kWh
|
$(-2,150.0)
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Fuel Oil #2 Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs