ITAC Assessment: MA0142
ITAC logo
ITAC Assessment: MA0142
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product PLASTIC BAGS & SHEETING
NAICS
n/a
SIC 3081: Unsupported Plastics Film and Sheet
Sales Range $50
M
to 100
M
# of Employees 600
Plant Area
n/a
Annual Production 100,000
thousand feet
Production Hrs. Annual 8,400
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $3,132,502 54,537,222
kWh
Fuel Oil #6 $101,795 33,522
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $228,725 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $96,659

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #6 Savings
01 2.4221: Install compressor air intakes in coolest locations $16,859 $570 $16,859
293,376
kWh
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $39,982 $5,700 $39,982
696,073
kWh
-
03 2.7226: Use computer programs to optimize hvac performance $42,075 $45,870 $42,075
732,708
kWh
-
04 2.6232: Install set-back timers $6,809 $900 $6,809
118,699
kWh
-
05 2.7245: Use direct air supply to exhaust hoods $43,200 $381,000 $43,200
138,921
kWh
-
06 2.2711: Utilize outside air instead of conditioned air for drying $27,100 $13,000 - $27,100
-
MMBtu
07 2.3131: Reschedule plant operations or reduce load to avoid peaks $52,700 $680 $52,700
-
kWh
-
TOTAL RECOMMENDED $228,725 $447,720 $201,625
1,979,777
kWh
$27,100
-
MMBtu
TOTAL IMPLEMENTED $96,659 $14,250 $69,559
293,376
kWh
$27,100
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #6 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs