ITAC Assessment: MA0130
ITAC logo
ITAC Assessment: MA0130
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product FORMED SHEET METAL PARTS
NAICS
n/a
SIC 3444: Sheet Metal Work
Sales Range $1
M
to 5
M
# of Employees 52
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,470
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $36,997 419,402
kWh
Natural Gas $8,319 1,190
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,283 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $154 $126 $154
1,758
kWh
-
02 2.2437: Recover waste heat from equipment $937 $139 - $937
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $753 $1,672 $753
8,499
kWh
-
04 2.6232: Install set-back timers $224 $225 $224
2,638
kWh
-
05 2.7226: Use computer programs to optimize hvac performance $2,215 $5,400 $2,215
25,205
kWh
-
TOTAL RECOMMENDED $4,283 $7,562 $3,346
38,100
kWh
$937
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs