Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Printed Fabric
NAICS
n/a
SIC 2261: Finishers of Broadwoven Fabrics of Cotton
Sales Range $10
M
to 50
M
# of Employees 117
Plant Area 105,000
ft2
Annual Production 150,000,000
thousand feet
Production Hrs. Annual 6,000
hrs
Location (State) Rhode Island

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $342,176 4,481,536
kWh
Electricity Demand $76,866 10,760
kW-mo/yr
Electricity Fees $1,583 -
Natural Gas $447,494 105,965
MMBtu
Fuel Oil #6 $238,744 78,573
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $148,850 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $134,501

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #6 Savings Other Liquid (haz) Savings Solid Waste (haz) Savings
01 2.2449: Recover heat from exhausted steam, hot air or hot water $95,807 $47,527 $(-2,529.0)
(-33,118)
kWh
$(-349.0)
-
kW-mo/yr
- $98,685
-
MMBtu
- -
02 2.2414: Use waste heat from hot flue gases to preheat $5,382 $1,100 - - $1,838
-
MMBtu
$3,544
-
MMBtu
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,884 $4,925 $4,118
53,341
kWh
$766
-
kW-mo/yr
- - - -
04 3.4145: Use magnetic technology to treat water $7,561 $18,983 - - - - $2,000
-
gal
$5,561
-
lb
05 2.2437: Recover waste heat from equipment $1,406 $858 - - $1,406
-
MMBtu
- - -
06 2.4221: Install compressor air intakes in coolest locations $604 $272 $604
7,913
kWh
- - - - -
07 2.2136: Install / repair insulation on steam lines $1,002 - - - $342
-
MMBtu
$660
-
MMBtu
- -
08 2.2427: Use waste heat from hot flue gases to preheat incoming fluids $32,204 $55,094 - - $10,898
-
MMBtu
$21,306
-
MMBtu
- -
TOTAL RECOMMENDED $148,850 $128,759 $2,193
28,136
kWh
$417
-
kW-mo/yr
$14,484
-
MMBtu
$124,195
-
MMBtu
$2,000
-
gal
$5,561
-
lb
TOTAL IMPLEMENTED $134,501 $107,818 $2,193
28,136
kWh
$417
-
kW-mo/yr
$11,240
-
MMBtu
$120,651
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #6 Savings Other Liquid (haz) Savings Solid Waste (haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs