Assessment Year | 1988 |
---|---|
Principal Product | ADULT DISPOSABLE BRIEFS |
NAICS |
n/a
|
SIC | 2676: Sanitary Paper Products |
Sales Range | $10 M to 50M |
# of Employees | 67 |
Plant Area |
n/a
|
Annual Production | 475,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $85,548 | 1,378,664 |
kWh
|
$0.062 |
LPG | $22,846 | 3,016 |
MMBtu
|
$7.57 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $16,067 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,318 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | LPG Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $782 | - |
$782
12,603
kWh
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $229 | $148 |
$229
3,810
kWh
|
- | - | |
03 | 2.7447: Install vinyl strip / high speed / air curtain doors | $280 | $455 | - |
$280
-
MMBtu
|
- | |
04 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $455 | $720 |
$455
7,327
kWh
|
- | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $586 | $109 |
$586
9,379
kWh
|
- | - | |
06 | 2.7221: Lower temperature during the winter season and vice-versa | $2,993 | $935 |
$382
6,155
kWh
|
$2,611
-
MMBtu
|
- | |
07 | 2.6124: Establish equipment maintenance schedule | $677 | $100 |
$677
11,723
kWh
|
- | - | |
08 | 2.2437: Recover waste heat from equipment | $10,065 | $28,770 | - |
$10,545
-
MMBtu
|
$(-480.0) | |
TOTAL RECOMMENDED | $16,067 | $31,237 |
$3,111
50,997
kWh
|
$13,436
-
MMBtu
|
$(-480.0) | ||
TOTAL IMPLEMENTED | $5,318 | $1,599 |
$2,427
39,860
kWh
|
$2,891
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | LPG Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs