Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product ADULT DISPOSABLE BRIEFS
NAICS
n/a
SIC 2676: Sanitary Paper Products
Sales Range $10
M
to 50
M
# of Employees 67
Plant Area
n/a
Annual Production 475,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $85,548 1,378,664
kWh
LPG $22,846 3,016
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,067 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,318

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings Administrative Changes Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $782 - $782
12,603
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $229 $148 $229
3,810
kWh
- -
03 2.7447: Install vinyl strip / high speed / air curtain doors $280 $455 - $280
-
MMBtu
-
04 2.7121: Utilize daylight whenever possible in lieu of artificial light $455 $720 $455
7,327
kWh
- -
05 2.4221: Install compressor air intakes in coolest locations $586 $109 $586
9,379
kWh
- -
06 2.7221: Lower temperature during the winter season and vice-versa $2,993 $935 $382
6,155
kWh
$2,611
-
MMBtu
-
07 2.6124: Establish equipment maintenance schedule $677 $100 $677
11,723
kWh
- -
08 2.2437: Recover waste heat from equipment $10,065 $28,770 - $10,545
-
MMBtu
$(-480.0)
TOTAL RECOMMENDED $16,067 $31,237 $3,111
50,997
kWh
$13,436
-
MMBtu
$(-480.0)
TOTAL IMPLEMENTED $5,318 $1,599 $2,427
39,860
kWh
$2,891
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings LPG Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs