Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Pet Food Cans
NAICS 332431: Metal Can Manufacturing
SIC 3411: Metal Cans
Sales Range $50
M
to 100
M
# of Employees 179
Plant Area 500,300
ft2
Annual Production 500,000,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $800,202 18,491,595
kWh
Electricity Demand $134,129 28,814
kW-mo/yr
Electricity Fees $177,929 -
Natural Gas $220,147 30,435
MMBtu
Waste Disposal Costs
Water Usage $7,508 684
Tgal
TOTAL YEARLY COSTS $1,339,915
RECOMMENDED SAVINGS* $97,578 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,788

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4239: Eliminate or reduce compressed air usage $42,345 $20,000 $36,875
857,558
kWh
$5,470
-
kW-mo/yr
- - -
02 2.2437: Recover waste heat from equipment $24,481 $25,000 - - $24,481
-
MMBtu
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,256 $4,500 $10,916
253,869
kWh
- - $(-560.0) $(-100.0)
04 2.4221: Install compressor air intakes in coolest locations $7,880 $12,650 $7,880
183,254
kWh
- - - -
05 2.4239: Eliminate or reduce compressed air usage $6,194 $140 $6,194
144,027
kWh
- - - -
06 2.1131: Repair faulty insulation in furnaces, boilers, etc $4,338 $7,210 - - $4,338
-
MMBtu
- -
07 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,084 $35 - $2,084
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $97,578 $69,535 $61,865
1,438,708
kWh
$7,554
-
kW-mo/yr
$28,819
-
MMBtu
$(-560.0) $(-100.0)
TOTAL IMPLEMENTED $20,788 $11,850 $17,110
397,896
kWh
- $4,338
-
MMBtu
$(-560.0) $(-100.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs