Assessment Year | 2023 |
---|---|
Principal Product | Pet Food Cans |
NAICS | 332431: Metal Can Manufacturing |
SIC | 3411: Metal Cans |
Sales Range | $50 M to 100M |
# of Employees | 179 |
Plant Area |
500,300
ft2
|
Annual Production | 500,000,000
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $800,202 | 18,491,595 |
kWh
|
$0.043 | |
Electricity Demand | $134,129 | 28,814 |
kW-mo/yr
|
$4.65 | |
Electricity Fees | $177,929 | - |
|
- | |
Natural Gas | $220,147 | 30,435 |
MMBtu
|
$7.23 | |
Waste Disposal Costs | |||||
Water Usage | $7,508 | 684 |
Tgal
|
$10.98 | |
TOTAL YEARLY COSTS | $1,339,915 | ||||
RECOMMENDED SAVINGS* | $97,578 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $20,788 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4239: Eliminate or reduce compressed air usage | $42,345 | $20,000 |
$36,875
857,558
kWh
|
$5,470
-
kW-mo/yr
|
- | - | - | |
02 | 2.2437: Recover waste heat from equipment | $24,481 | $25,000 | - | - |
$24,481
-
MMBtu
|
- | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $10,256 | $4,500 |
$10,916
253,869
kWh
|
- | - | $(-560.0) | $(-100.0) | |
04 | 2.4221: Install compressor air intakes in coolest locations | $7,880 | $12,650 |
$7,880
183,254
kWh
|
- | - | - | - | |
05 | 2.4239: Eliminate or reduce compressed air usage | $6,194 | $140 |
$6,194
144,027
kWh
|
- | - | - | - | |
06 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $4,338 | $7,210 | - | - |
$4,338
-
MMBtu
|
- | - | |
07 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $2,084 | $35 | - |
$2,084
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $97,578 | $69,535 |
$61,865
1,438,708
kWh
|
$7,554
-
kW-mo/yr
|
$28,819
-
MMBtu
|
$(-560.0) | $(-100.0) | ||
TOTAL IMPLEMENTED | $20,788 | $11,850 |
$17,110
397,896
kWh
|
- |
$4,338
-
MMBtu
|
$(-560.0) | $(-100.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs