| Assessment Year | 1988 |
|---|---|
| Principal Product | CASTINGS FOR AEROSPACE |
| NAICS |
n/a
|
| SIC | 3365: Aluminum Foundries |
| Sales Range | $10 M to 50M |
| # of Employees | 300 |
| Plant Area |
n/a
|
| Annual Production | 581,200
lb
|
| Production Hrs. Annual | 6,600
hrs
|
| Location (State) | New Hampshire |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $525,166 | 7,859,906 |
kWh
|
$0.067 |
| Natural Gas | $252,966 | 44,420 |
MMBtu
|
$5.69 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $32,312 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $23,799 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,227 | $261 |
$3,227
48,945
kWh
|
- | |
| 02 | 2.2437: Recover waste heat from equipment | $3,093 | $6,500 | - |
$3,093
-
MMBtu
|
|
| 03 | 2.4221: Install compressor air intakes in coolest locations | $2,193 | $300 |
$2,193
32,825
kWh
|
- | |
| 04 | 2.7226: Use computer programs to optimize hvac performance | $17,916 | $10,000 |
$17,916
268,171
kWh
|
- | |
| 05 | 2.7261: Install timers and/or thermostats | $5,883 | $3,400 | - |
$5,883
-
MMBtu
|
|
| TOTAL RECOMMENDED | $32,312 | $20,461 |
$23,336
349,941
kWh
|
$8,976
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $23,799 | $13,400 |
$17,916
268,171
kWh
|
$5,883
-
MMBtu
|
||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs