ITAC Assessment: MA0120
ITAC logo
ITAC Assessment: MA0120
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product ELECTRICAL COMPONENTS
NAICS
n/a
SIC 3629: Electrical Industrial Apparatus, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area
n/a
Annual Production 7,250,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Vermont

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $328,552 4,599,062
kWh
LPG $9,458 1,055
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $102,289 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $3,682 $70 $3,682
67,116
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $870 $542 $870
12,016
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $962 $231 $962
12,309
kWh
-
04 2.7226: Use computer programs to optimize hvac performance $25,643 $42,500 $25,643
604,631
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $10,063 $9,516 $10,063
140,387
kWh
-
06 2.7261: Install timers and/or thermostats $2,845 $1,275 $2,845
74,443
kWh
-
07 2.1311: Replace electrically-operated equipment with fossil fuel equipment $36,657 $46,930 $74,279
1,046,014
kWh
$(-37,622.0)
-
MMBtu
09 2.3191: Use demand controller or load shedder $2,073 $295 $2,073
-
kWh
-
10 2.7226: Use computer programs to optimize hvac performance $3,650 $6,000 $3,650
-
kWh
-
11 2.1311: Replace electrically-operated equipment with fossil fuel equipment $15,844 - $26,101
142,732
kWh
$(-10,257.0)
-
MMBtu
TOTAL RECOMMENDED $102,289 $107,359 $150,168
2,099,648
kWh
$(-47,879.0)
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings LPG Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs