ITAC Assessment: MA0117
ITAC logo
ITAC Assessment: MA0117
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product COTTON & NYLON FLOCK
NAICS
n/a
SIC 2299: Textile goods, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 35
Plant Area
n/a
Annual Production 2,300,000
lb
Production Hrs. Annual 4,608
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $160,962 2,072,099
kWh
LPG $840 92
MMBtu
Fuel Oil #2 $700 140
MMBtu
Fuel Oil #4 $4,095 936
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,245 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,205

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings Fuel Oil #4 Savings
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $625 $105 $625
8,206
kWh
- -
03 2.2614: Use cooling tower or economizer to replace chiller cooling $2,384 $5,878 $2,384
30,774
kWh
- -
04 2.7261: Install timers and/or thermostats $240 $75 - $240
-
MMBtu
-
05 2.7221: Lower temperature during the winter season and vice-versa $340 - - - $340
-
MMBtu
06 2.4322: Use or replace with energy efficient substitutes $11,656 $2,040 $11,656
150,059
kWh
- -
TOTAL RECOMMENDED $15,245 $8,098 $14,665
189,039
kWh
$240
-
MMBtu
$340
-
MMBtu
TOTAL IMPLEMENTED $1,205 $180 $625
8,206
kWh
$240
-
MMBtu
$340
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs