Assessment Year | 1993 |
---|---|
Principal Product | Investment Castings |
NAICS |
n/a
|
SIC | 3369: Nonferrous Foundries, Except Aluminum and Copper |
Sales Range | $10 M to 50M |
# of Employees | 152 |
Plant Area |
58,000
ft2
|
Annual Production | 924,000
lb
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $440,303 | 4,373,974 |
kWh
|
$0.10 |
Natural Gas | $97,719 | 16,545 |
MMBtu
|
$5.91 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $116,130 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $56,317 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $29,275 | $20,000 |
$29,275
-
kWh
|
- | |
02 | 2.8114: Change rate schedules or other changes in utility service | $48,223 | $135,000 |
$48,223
-
kWh
|
- | |
03 | 2.2414: Use waste heat from hot flue gases to preheat | $15,565 | $38,000 | - |
$15,565
-
MMBtu
|
|
04 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $11,292 | $20,600 |
$11,292
-
kWh
|
- | |
05 | 2.2123: Insulate feedwater tank | $1,488 | $3,000 | - |
$1,488
-
MMBtu
|
|
06 | 2.4133: Use most efficient type of electric motors | $4,881 | $6,250 |
$4,881
49,824
kWh
|
- | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,386 | $1,800 |
$3,386
43,376
kWh
|
- | |
08 | 2.4221: Install compressor air intakes in coolest locations | $1,308 | $700 |
$1,308
12,896
kWh
|
- | |
09 | 2.1211: Move boiler to more efficient location | $414 | $639 |
$414
13,189
kWh
|
- | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $298 | $158 |
$298
2,931
kWh
|
- | |
TOTAL RECOMMENDED | $116,130 | $226,147 |
$99,077
122,216
kWh
|
$17,053
-
MMBtu
|
||
TOTAL IMPLEMENTED | $56,317 | $70,389 |
$39,264
119,285
kWh
|
$17,053
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs