ITAC Assessment: MA0114
ITAC logo
ITAC Assessment: MA0114
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product MEMBRANE FILTERS & EQUIPMENT
NAICS
n/a
SIC 3569: General Industrial Machinery and Equipment, Not Elsewhere
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,125
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $183,454 2,383,060
kWh
LPG $8,263 970
MMBtu
Fuel Oil #2 $10,740 2,675
MMBtu
Fuel Oil #4 $16,202 4,637
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,554 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,183

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings Fuel Oil #2 Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,356 $10,888 $1,356
17,585
kWh
- - -
02 2.7226: Use computer programs to optimize hvac performance $3,355 $8,000 $3,355
43,669
kWh
- - -
03 2.6218: Turn off equipment when not in use $192 - $192
2,638
kWh
- - -
04 2.3212: Optimize plant power factor $9,930 $23,000 $9,930
-
kWh
- - -
05 2.2437: Recover waste heat from equipment $419 $1,250 $(-90.0)
(-1,172)
kWh
$509
-
MMBtu
- -
06 2.6232: Install set-back timers $277 $200 $277
3,517
kWh
- - -
07 2.7447: Install vinyl strip / high speed / air curtain doors $3,077 $600 - $3,077
-
MMBtu
- -
08 2.7494: Install storm windows and doors $1,483 $1,570 - $1,483
-
MMBtu
- -
09 2.1233: Analyze flue gas for proper air/fuel ratio $465 $450 - - $1,617
-
MMBtu
$(-1,152.0)
TOTAL RECOMMENDED $20,554 $45,958 $15,020
66,237
kWh
$5,069
-
MMBtu
$1,617
-
MMBtu
$(-1,152.0)
TOTAL IMPLEMENTED $18,183 $42,938 $14,641
61,254
kWh
$3,077
-
MMBtu
$1,617
-
MMBtu
$(-1,152.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings LPG Savings Fuel Oil #2 Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs