Assessment Year | 2005 |
---|---|
Principal Product | Bell Pepper and Cabbage |
NAICS | 311411: Frozen Fruit, Juice, and Vegetable Manufacturing |
SIC | 2037: Frozen Fruits, Fruit Juices, and Vegetables |
Sales Range | $10 M to 50M |
# of Employees | 350 |
Plant Area |
50,000
ft2
|
Annual Production | 7,599
ton
|
Production Hrs. Annual | 3,360
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $378,747 | 4,777,432 |
kWh
|
$0.079 |
Electricity Demand | $220,542 | 14,857 |
kW-mo/yr
|
$14.84 |
Natural Gas | $153,385 | 20,366 |
MMBtu
|
$7.53 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $65,050 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $45,101 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.7134: Use photocell controls | $381 | $360 |
$304
3,851
kWh
|
$77
-
kW-mo/yr
|
|
02 | 2.6231: Utilize controls to operate equipment only when needed | $19,568 | $19,053 |
$19,568
247,081
kWh
|
- | |
03 | 2.4322: Use or replace with energy efficient substitutes | $18,204 | $20,250 |
$13,049
1,647,665
kWh
|
$5,155
-
kW-mo/yr
|
|
04 | 2.4133: Use most efficient type of electric motors | $18,411 | $23,058 |
$11,018
139,486
kWh
|
$7,393
-
kW-mo/yr
|
|
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,934 | $18,325 |
$3,619
45,690
kWh
|
$2,315
-
kW-mo/yr
|
|
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,552 | $4,648 |
$1,309
16,532
kWh
|
$1,243
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $65,050 | $85,694 |
$48,867
2,100,305
kWh
|
$16,183
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $45,101 | $66,281 |
$28,995
1,849,373
kWh
|
$16,106
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs