Assessment Year | 1987 |
---|---|
Principal Product | PLASTIC CASSETTE CASES |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 105 |
Plant Area |
n/a
|
Annual Production | 350,000,000
pieces
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $506,975 | 9,459,262 |
kWh
|
$0.054 |
Natural Gas | $240 | 30 |
MMBtu
|
$8.00 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $26,982 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $13,413 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4221: Install compressor air intakes in coolest locations | $600 | $150 |
$600
11,137
kWh
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $813 | $197 |
$813
15,240
kWh
|
- | |
03 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $4,507 | $4,630 |
$10,447
194,900
kWh
|
$(-5,940.0)
-
MMBtu
|
|
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $851 | - |
$851
15,826
kWh
|
- | |
05 | 2.7261: Install timers and/or thermostats | $3,875 | $1,100 |
$3,875
72,392
kWh
|
- | |
06 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $11,153 | $860 |
$11,153
47,773
kWh
|
- | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,580 | $6,238 |
$3,580
66,823
kWh
|
- | |
08 | 2.6241: Reduce temperature of process equipment when on standby | $1,603 | $1,000 |
$1,603
29,894
kWh
|
- | |
TOTAL RECOMMENDED | $26,982 | $14,175 |
$32,922
453,985
kWh
|
$(-5,940.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | $13,413 | $12,118 |
$19,353
361,078
kWh
|
$(-5,940.0)
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs