ITAC Assessment: MA0095
ITAC logo
ITAC Assessment: MA0095
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product ELECTRONIC COMPONENTS
NAICS
n/a
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,500
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $268,667 2,929,953
kWh
Natural Gas $7,115 1,085
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $44,662 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,887 $621 $2,887
31,360
kWh
-
02 2.6212: Turn off equipment during breaks, reduce operating time $1,496 $32 $105
1,172
kWh
$1,391
-
MMBtu
03 2.6212: Turn off equipment during breaks, reduce operating time $917 - $917
9,965
kWh
-
04 2.3512: De-energize excess transformer capacity $9,149 $2,984 $9,149
99,648
kWh
-
05 2.7226: Use computer programs to optimize hvac performance $17,922 $6,400 $17,922
195,487
kWh
-
06 2.7261: Install timers and/or thermostats $12,261 $1,700 - $12,261
-
MMBtu
07 2.4221: Install compressor air intakes in coolest locations $30 $100 $30
293
kWh
-
TOTAL RECOMMENDED $44,662 $11,837 $31,010
337,925
kWh
$13,652
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs