ITAC Assessment: MA0090
ITAC logo
ITAC Assessment: MA0090
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product ELECTRONIC COMPONENTS
NAICS
n/a
SIC 3825: Instruments for Measuring and Testing of Electricity and Electrical Signals
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area
n/a
Annual Production 1,365
pieces
Production Hrs. Annual 2,500
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $234,990 2,490,621
kWh
Natural Gas $22,588 3,403
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,282 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,745 $901 $2,745
29,015
kWh
-
02 2.6212: Turn off equipment during breaks, reduce operating time $2,660 $43 $190
2,052
kWh
$2,470
-
MMBtu
03 2.6212: Turn off equipment during breaks, reduce operating time $943 - $943
9,965
kWh
-
04 2.7261: Install timers and/or thermostats $9,216 $935 - $9,216
-
MMBtu
05 2.6124: Establish equipment maintenance schedule $14,656 $3,520 $14,656
155,334
kWh
-
06 2.4221: Install compressor air intakes in coolest locations $62 $200 $62
586
kWh
-
TOTAL RECOMMENDED $30,282 $5,599 $18,596
196,952
kWh
$11,686
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs