ITAC Assessment: OK0240
ITAC logo
ITAC Assessment: OK0240
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product DRILL. PUMP COMPONENTS
NAICS
n/a
SIC 3533: Oil and Gas Field Machinery and Equipment
Sales Range $5
M
to 10
M
# of Employees 300
Plant Area
n/a
Annual Production 12,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $327,342 6,578,546
kWh
Natural Gas $85,437 19,548
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,017 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,017

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7221: Lower temperature during the winter season and vice-versa $2,147 $5,000 - $2,147
-
MMBtu
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,153 - $1,233
34,877
kWh
- $(-80.0)
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,092 - $1,092
24,033
kWh
- -
04 2.4133: Use most efficient type of electric motors $576 $353 $576
12,603
kWh
- -
05 2.2511: Insulate bare equipment $561 $240 $561
15,826
kWh
- -
06 2.2514: Cover open tanks $1,626 $269 $1,626
46,014
kWh
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $4,858 $1,215 $4,858
104,045
kWh
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $2,004 $3,000 $2,004
42,790
kWh
- -
TOTAL RECOMMENDED $14,017 $10,077 $11,950
280,188
kWh
$2,147
-
MMBtu
$(-80.0)
TOTAL IMPLEMENTED $14,017 $10,077 $11,950
280,188
kWh
$2,147
-
MMBtu
$(-80.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs