Assessment Year | 1988 |
---|---|
Principal Product | DRILL. PUMP COMPONENTS |
NAICS |
n/a
|
SIC | 3533: Oil and Gas Field Machinery and Equipment |
Sales Range | $5 M to 10M |
# of Employees | 300 |
Plant Area |
n/a
|
Annual Production | 12,000,000
lb
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $327,342 | 6,578,546 |
kWh
|
$0.050 |
Natural Gas | $85,437 | 19,548 |
MMBtu
|
$4.37 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $14,017 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $14,017 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7221: Lower temperature during the winter season and vice-versa | $2,147 | $5,000 | - |
$2,147
-
MMBtu
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,153 | - |
$1,233
34,877
kWh
|
- | $(-80.0) | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,092 | - |
$1,092
24,033
kWh
|
- | - | |
04 | 2.4133: Use most efficient type of electric motors | $576 | $353 |
$576
12,603
kWh
|
- | - | |
05 | 2.2511: Insulate bare equipment | $561 | $240 |
$561
15,826
kWh
|
- | - | |
06 | 2.2514: Cover open tanks | $1,626 | $269 |
$1,626
46,014
kWh
|
- | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,858 | $1,215 |
$4,858
104,045
kWh
|
- | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,004 | $3,000 |
$2,004
42,790
kWh
|
- | - | |
TOTAL RECOMMENDED | $14,017 | $10,077 |
$11,950
280,188
kWh
|
$2,147
-
MMBtu
|
$(-80.0) | ||
TOTAL IMPLEMENTED | $14,017 | $10,077 |
$11,950
280,188
kWh
|
$2,147
-
MMBtu
|
$(-80.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |