Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product PROTECTIVE PACKAGING
NAICS
n/a
SIC 2657: Folding Paperboard Boxes, Including Sanitary
Sales Range $1
M
to 5
M
# of Employees 120
Plant Area
n/a
Annual Production 400,000
lb
Production Hrs. Annual 2,250
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $37,824 493,552
kWh
Natural Gas $11,477 1,967
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,951 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,693

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,611 - $1,611
20,809
kWh
-
02 2.4221: Install compressor air intakes in coolest locations $223 $200 $223
2,931
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,470 $375 $2,470
31,946
kWh
-
04 2.7447: Install vinyl strip / high speed / air curtain doors $2,575 $5,300 - $2,575
-
MMBtu
05 2.7229: Air condition only space necessary $1,072 $2,000 - $1,072
-
MMBtu
TOTAL RECOMMENDED $7,951 $7,875 $4,304
55,686
kWh
$3,647
-
MMBtu
TOTAL IMPLEMENTED $2,693 $575 $2,693
34,877
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs