| Assessment Year | 1986 |
|---|---|
| Principal Product | NICKEL PLATING |
| NAICS |
n/a
|
| SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
| Sales Range | $1 M to 5M |
| # of Employees | 23 |
| Plant Area |
n/a
|
| Annual Production | 40,000
lb
|
| Production Hrs. Annual | 4,368
hrs
|
| Location (State) | Massachusetts |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $13,806 | 174,971 |
kWh
|
$0.079 |
| Fuel Oil #2 | $37,438 | 5,180 |
MMBtu
|
$7.23 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $17,152 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #2 Savings |
|---|---|---|---|---|---|---|
| 01 | 2.2514: Cover open tanks | $1,979 | $207 | - |
$1,979
-
MMBtu
|
|
| 02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,411 | $600 | - |
$2,411
-
MMBtu
|
|
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $274 | $64 |
$274
3,517
kWh
|
- | |
| 04 | 2.4221: Install compressor air intakes in coolest locations | $131 | $100 |
$131
1,758
kWh
|
- | |
| 05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $2,064 | $440 | - |
$2,064
-
MMBtu
|
|
| 06 | 2.2113: Repair or replace steam traps | $8,227 | $195 | - |
$8,227
-
MMBtu
|
|
| 07 | 2.6241: Reduce temperature of process equipment when on standby | $748 | $1,107 |
$748
9,379
kWh
|
- | |
| 08 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $510 | $340 | - |
$510
-
MMBtu
|
|
| 09 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $808 | $2,200 |
$808
9,965
kWh
|
- | |
| TOTAL RECOMMENDED | $17,152 | $5,253 |
$1,961
24,619
kWh
|
$15,191
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Fuel Oil #2 Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs