Assessment Year | 1986 |
---|---|
Principal Product | NICKEL PLATING |
NAICS |
n/a
|
SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
Sales Range | $1 M to 5M |
# of Employees | 23 |
Plant Area |
n/a
|
Annual Production | 40,000
lb
|
Production Hrs. Annual | 4,368
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $13,806 | 174,971 |
kWh
|
$0.079 |
Fuel Oil #2 | $37,438 | 5,180 |
MMBtu
|
$7.23 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $17,152 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #2 Savings |
---|---|---|---|---|---|---|
01 | 2.2514: Cover open tanks | $1,979 | $207 | - |
$1,979
-
MMBtu
|
|
02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,411 | $600 | - |
$2,411
-
MMBtu
|
|
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $274 | $64 |
$274
3,517
kWh
|
- | |
04 | 2.4221: Install compressor air intakes in coolest locations | $131 | $100 |
$131
1,758
kWh
|
- | |
05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $2,064 | $440 | - |
$2,064
-
MMBtu
|
|
06 | 2.2113: Repair or replace steam traps | $8,227 | $195 | - |
$8,227
-
MMBtu
|
|
07 | 2.6241: Reduce temperature of process equipment when on standby | $748 | $1,107 |
$748
9,379
kWh
|
- | |
08 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $510 | $340 | - |
$510
-
MMBtu
|
|
09 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $808 | $2,200 |
$808
9,965
kWh
|
- | |
TOTAL RECOMMENDED | $17,152 | $5,253 |
$1,961
24,619
kWh
|
$15,191
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Fuel Oil #2 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs