ITAC Assessment: LT0115
ITAC logo
ITAC Assessment: LT0115
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product CONVERTED PAPER
NAICS
n/a
SIC 2679: Converted Paper and Paperboard Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 88
Plant Area
n/a
Annual Production 68,000
ton
Production Hrs. Annual 6,000
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $231,768 4,427,902
kWh
Natural Gas $5,796 3,057
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,127 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,541

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7231: Use radiant heater for spot heating $340 $5,000 - $340
-
MMBtu
-
02 2.7229: Air condition only space necessary $2,754 - $1,466
35,756
kWh
$1,288
-
MMBtu
-
03 2.7121: Utilize daylight whenever possible in lieu of artificial light $345 - $345
8,499
kWh
- -
04 2.6232: Install set-back timers $3,315 - $3,315
80,891
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $183 $118 $208
4,103
kWh
- $(-25.0)
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,177 $475 $992
21,981
kWh
- $185
07 2.7142: Utilize higher efficiency lamps and/or ballasts $716 $315 $980
24,033
kWh
- $(-264.0)
08 2.6212: Turn off equipment during breaks, reduce operating time $365 - $365
8,792
kWh
- -
09 2.4133: Use most efficient type of electric motors $564 $890 $564
12,309
kWh
- -
10 2.7261: Install timers and/or thermostats $185 $69 $85
13,189
kWh
$100
-
MMBtu
-
11 2.7224: Reduce space conditioning during non-working hours $313 $50 $313
7,620
kWh
- -
12 2.1311: Replace electrically-operated equipment with fossil fuel equipment $870 $2,000 $992
17,878
kWh
$(-122.0)
-
MMBtu
-
TOTAL RECOMMENDED $11,127 $8,917 $9,625
235,051
kWh
$1,606
-
MMBtu
$(-104.0)
TOTAL IMPLEMENTED $9,541 $6,602 $7,653
193,140
kWh
$1,728
-
MMBtu
$160
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs