ITAC Assessment: TT0069
ITAC logo
ITAC Assessment: TT0069
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product HVAC Coils
NAICS 332996: Fabricated Pipe and Pipe Fitting Manufacturing
SIC 3498: Fabricated Pipe and Pipe Fittings
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area 68,000
ft2
Annual Production 15,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $60,470 1,015,920
kWh
Electricity Demand $26,841 3,090
kW-mo/yr
Electricity Fees $1,668 -
Natural Gas $8,230 1,146
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,656 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings
01 2.7111: Reduce illumination to minimum necessary levels $1,768 - $1,768
19,968
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,271 $3,600 $3,271
36,940
kWh
-
03 2.7241: Install outside air damper / economizer on hvac unit $549 $600 $549
6,200
kWh
-
04 2.3212: Optimize plant power factor $985 $1,980 - $985
05 3.7312: Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $2,083 $4,900 $2,083
23,528
kWh
-
TOTAL RECOMMENDED $8,656 $11,080 $7,671
86,636
kWh
$985
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs