ITAC Assessment: LT0079
ITAC logo
ITAC Assessment: LT0079
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product PIPE REPAIR CLAMPS
NAICS
n/a
SIC 3494: Valves and Pipe Fittings, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 275
Plant Area
n/a
Annual Production 600,000
pieces
Production Hrs. Annual 7,200
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $395,869 8,553,927
kWh
Natural Gas $20,880 4,731
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,511 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,624

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6232: Install set-back timers $19,773 $2,150 $19,773
601,114
kWh
-
02 2.2514: Cover open tanks $3,490 $800 $3,490
106,389
kWh
-
03 2.7446: Utilize sensors controlling roof and wall openings $887 $1,800 $887
26,964
kWh
-
04 2.1122: Re-size charging openings or add a movable door on equipment $4,361 $750 - $4,361
-
MMBtu
TOTAL RECOMMENDED $28,511 $5,500 $24,150
734,467
kWh
$4,361
-
MMBtu
TOTAL IMPLEMENTED $27,624 $3,700 $23,263
707,503
kWh
$4,361
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs