Assessment Year | 1986 |
---|---|
Principal Product | PIPE REPAIR CLAMPS |
NAICS |
n/a
|
SIC | 3494: Valves and Pipe Fittings, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 275 |
Plant Area |
n/a
|
Annual Production | 600,000
pieces
|
Production Hrs. Annual | 7,200
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $395,869 | 8,553,927 |
kWh
|
$0.046 |
Natural Gas | $20,880 | 4,731 |
MMBtu
|
$4.41 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $28,511 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $27,624 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.6232: Install set-back timers | $19,773 | $2,150 |
$19,773
601,114
kWh
|
- | |
02 | 2.2514: Cover open tanks | $3,490 | $800 |
$3,490
106,389
kWh
|
- | |
03 | 2.7446: Utilize sensors controlling roof and wall openings | $887 | $1,800 |
$887
26,964
kWh
|
- | |
04 | 2.1122: Re-size charging openings or add a movable door on equipment | $4,361 | $750 | - |
$4,361
-
MMBtu
|
|
TOTAL RECOMMENDED | $28,511 | $5,500 |
$24,150
734,467
kWh
|
$4,361
-
MMBtu
|
||
TOTAL IMPLEMENTED | $27,624 | $3,700 |
$23,263
707,503
kWh
|
$4,361
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs