Assessment Year | 2022 |
---|---|
Principal Product | Gas Production Unit |
NAICS | 237120: Oil and Gas Pipeline and Related Structures Construction |
SIC | 1623: Water, Sewer, Pipeline, and Communications and Power Line Construction |
Sales Range | $10 M to 50M |
# of Employees | 75 |
Plant Area |
120,000
ft2
|
Annual Production | 1,000
units
|
Production Hrs. Annual | 2,500
hrs
|
Location (State) | West Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $56,161 | 1,267,745 |
kWh
|
$0.044 | |
Electricity Demand | $81,311 | 4,922 |
kW-mo/yr
|
$16.52 | |
Electricity Fees | $1,630 | - |
|
- | |
Natural Gas | $88,615 | 10,477 |
MMBtu
|
$8.46 | |
Waste Disposal Costs | |||||
Water Usage | $13,573 | 229 |
Tgal
|
$59.32 | |
Water Disposal | $2,170 | 273 |
Tgal
|
$7.95 | |
TOTAL YEARLY COSTS | $243,460 | ||||
RECOMMENDED SAVINGS* | $59,719 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $8,827 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Usage Savings | Water Disposal Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $15,156 | $10,857 |
$5,426
122,486
kWh
|
$9,730
-
kW-mo/yr
|
- | - | - | |
02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $13,877 | $5,625 | - |
$13,877
-
kW-mo/yr
|
- | - | - | |
03 | 2.4322: Use or replace with energy efficient substitutes | $7,979 | $36,800 |
$2,858
64,512
kWh
|
$5,121
-
kW-mo/yr
|
- | - | - | |
04 | 3.4151: Minimize water usage | $7,539 | $4,229 |
$(-25.0)
(-566)
kWh
|
- |
$7,087
-
Tgal
|
$961
-
Tgal
|
$(-484.0) | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $6,341 | $12,560 |
$1,781
40,209
kWh
|
$4,560
-
kW-mo/yr
|
- | - | - | |
06 | 2.4224: Upgrade controls on compressors | $5,499 | $3,930 |
$1,534
34,627
kWh
|
$3,965
-
kW-mo/yr
|
- | - | - | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,727 | $145 |
$620
14,006
kWh
|
$1,107
-
kW-mo/yr
|
- | - | - | |
08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,085 | $50 |
$391
8,817
kWh
|
$694
-
kW-mo/yr
|
- | - | - | |
09 | 2.4239: Eliminate or reduce compressed air usage | $516 | $552 |
$186
4,203
kWh
|
$330
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $59,719 | $74,748 |
$12,771
288,294
kWh
|
$39,384
-
kW-mo/yr
|
$7,087
-
Tgal
|
$961
-
Tgal
|
$(-484.0) | ||
TOTAL IMPLEMENTED | $8,827 | $4,677 |
$2,731
61,653
kWh
|
$6,096
-
kW-mo/yr
|
- | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Usage Savings | Water Disposal Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs