ITAC Assessment: WV0627
ITAC logo
ITAC Assessment: WV0627
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Gas Production Unit
NAICS 237120: Oil and Gas Pipeline and Related Structures Construction
SIC 1623: Water, Sewer, Pipeline, and Communications and Power Line Construction
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 120,000
ft2
Annual Production 1,000
units
Production Hrs. Annual 2,500
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $56,161 1,267,745
kWh
Electricity Demand $81,311 4,922
kW-mo/yr
Electricity Fees $1,630 -
Natural Gas $88,615 10,477
MMBtu
Waste Disposal Costs
Water Usage $13,573 229
Tgal
Water Disposal $2,170 273
Tgal
TOTAL YEARLY COSTS $243,460
RECOMMENDED SAVINGS* $59,719 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,827

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Usage Savings Water Disposal Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $15,156 $10,857 $5,426
122,486
kWh
$9,730
-
kW-mo/yr
- - -
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $13,877 $5,625 - $13,877
-
kW-mo/yr
- - -
03 2.4322: Use or replace with energy efficient substitutes $7,979 $36,800 $2,858
64,512
kWh
$5,121
-
kW-mo/yr
- - -
04 3.4151: Minimize water usage $7,539 $4,229 $(-25.0)
(-566)
kWh
- $7,087
-
Tgal
$961
-
Tgal
$(-484.0)
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,341 $12,560 $1,781
40,209
kWh
$4,560
-
kW-mo/yr
- - -
06 2.4224: Upgrade controls on compressors $5,499 $3,930 $1,534
34,627
kWh
$3,965
-
kW-mo/yr
- - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,727 $145 $620
14,006
kWh
$1,107
-
kW-mo/yr
- - -
08 2.4231: Reduce the pressure of compressed air to the minimum required $1,085 $50 $391
8,817
kWh
$694
-
kW-mo/yr
- - -
09 2.4239: Eliminate or reduce compressed air usage $516 $552 $186
4,203
kWh
$330
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $59,719 $74,748 $12,771
288,294
kWh
$39,384
-
kW-mo/yr
$7,087
-
Tgal
$961
-
Tgal
$(-484.0)
TOTAL IMPLEMENTED $8,827 $4,677 $2,731
61,653
kWh
$6,096
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Usage Savings Water Disposal Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs