| Assessment Year | 1982 |
|---|---|
| Principal Product | CLAY BRICK |
| NAICS |
n/a
|
| SIC | 3251: Brick and Structural Clay Tile |
| Sales Range | $1 M to 5M |
| # of Employees | 70 |
| Plant Area |
n/a
|
| Annual Production | 30,000,000
pieces
|
| Production Hrs. Annual | 4,250
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $213,122 | 5,762,016 |
kWh
|
$0.037 |
| Natural Gas | $1,060,787 | 349,283 |
MMBtu
|
$3.04 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $179,228 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $155,875 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $13,100 | $40,311 | - |
$13,100
-
MMBtu
|
|
| 02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $63,919 | $3,400 | - |
$63,919
-
MMBtu
|
|
| 03 | 2.2511: Insulate bare equipment | $5,689 | $2,430 | - |
$5,689
-
MMBtu
|
|
| 04 | 2.2443: Re-use or recycle hot or cold process exhaust air | $82,335 | $19,850 | - |
$82,335
-
MMBtu
|
|
| 05 | 2.4133: Use most efficient type of electric motors | $1,007 | $994 |
$1,007
27,550
kWh
|
- | |
| 06 | 2.4133: Use most efficient type of electric motors | $318 | $760 |
$318
6,741
kWh
|
- | |
| 07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,311 | $147 |
$3,311
123,974
kWh
|
- | |
| 08 | 2.4221: Install compressor air intakes in coolest locations | $113 | $91 |
$113
4,103
kWh
|
- | |
| 09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,881 | $15,180 |
$6,881
163,247
kWh
|
- | |
| 10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,571 | $2,970 |
$1,571
37,222
kWh
|
- | |
| 11 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $325 | $990 |
$325
7,327
kWh
|
- | |
| 12 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $151 | $94 |
$151
3,517
kWh
|
- | |
| 13 | 2.7111: Reduce illumination to minimum necessary levels | $508 | $300 |
$508
14,068
kWh
|
- | |
| TOTAL RECOMMENDED | $179,228 | $87,517 |
$14,185
387,749
kWh
|
$165,043
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $155,875 | $26,218 |
$3,932
142,145
kWh
|
$151,943
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs