ITAC Assessment: OK0067
ITAC logo
ITAC Assessment: OK0067
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product CLAY BRICK
NAICS
n/a
SIC 3251: Brick and Structural Clay Tile
Sales Range $1
M
to 5
M
# of Employees 70
Plant Area
n/a
Annual Production 30,000,000
pieces
Production Hrs. Annual 4,250
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $213,122 5,762,016
kWh
Natural Gas $1,060,787 349,283
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $179,228 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $155,875

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1131: Repair faulty insulation in furnaces, boilers, etc $13,100 $40,311 - $13,100
-
MMBtu
02 2.1233: Analyze flue gas for proper air/fuel ratio $63,919 $3,400 - $63,919
-
MMBtu
03 2.2511: Insulate bare equipment $5,689 $2,430 - $5,689
-
MMBtu
04 2.2443: Re-use or recycle hot or cold process exhaust air $82,335 $19,850 - $82,335
-
MMBtu
05 2.4133: Use most efficient type of electric motors $1,007 $994 $1,007
27,550
kWh
-
06 2.4133: Use most efficient type of electric motors $318 $760 $318
6,741
kWh
-
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,311 $147 $3,311
123,974
kWh
-
08 2.4221: Install compressor air intakes in coolest locations $113 $91 $113
4,103
kWh
-
09 2.7142: Utilize higher efficiency lamps and/or ballasts $6,881 $15,180 $6,881
163,247
kWh
-
10 2.7142: Utilize higher efficiency lamps and/or ballasts $1,571 $2,970 $1,571
37,222
kWh
-
11 2.7142: Utilize higher efficiency lamps and/or ballasts $325 $990 $325
7,327
kWh
-
12 2.7142: Utilize higher efficiency lamps and/or ballasts $151 $94 $151
3,517
kWh
-
13 2.7111: Reduce illumination to minimum necessary levels $508 $300 $508
14,068
kWh
-
TOTAL RECOMMENDED $179,228 $87,517 $14,185
387,749
kWh
$165,043
-
MMBtu
TOTAL IMPLEMENTED $155,875 $26,218 $3,932
142,145
kWh
$151,943
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs