| Assessment Year | 1992 |
|---|---|
| Principal Product | ATHLETIC UNIFORMS |
| NAICS |
n/a
|
| SIC | 2329: Men's and Boys' Clothing, Not Elsewhere Classified |
| Sales Range | $5 M to 10M |
| # of Employees | 240 |
| Plant Area |
n/a
|
| Annual Production | 133,000
pieces
|
| Production Hrs. Annual | 4,420
hrs
|
| Location (State) | Iowa |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $38,859 | 748,535 |
kWh
|
$0.052 |
| Natural Gas | $28,486 | 7,242 |
MMBtu
|
$3.93 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $6,209 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $4,133 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.2437: Recover waste heat from equipment | $1,328 | $1,297 | - |
$1,328
-
MMBtu
|
- | |
| 02 | 2.2136: Install / repair insulation on steam lines | $533 | $361 | - |
$533
-
MMBtu
|
- | |
| 03 | 2.2122: Install / repair insulation on condensate lines | $191 | $66 | - |
$191
-
MMBtu
|
- | |
| 04 | 2.6232: Install set-back timers | $2,643 | $3,441 |
$2,643
50,996
kWh
|
- | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $274 | $172 |
$655
12,603
kWh
|
- | $(-381.0) | |
| 06 | 2.7111: Reduce illumination to minimum necessary levels | $557 | $250 |
$557
10,844
kWh
|
- | - | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $423 | $600 |
$423
8,206
kWh
|
- | - | |
| 08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $260 | $20 |
$260
4,982
kWh
|
- | - | |
| TOTAL RECOMMENDED | $6,209 | $6,207 |
$4,538
87,631
kWh
|
$2,052
-
MMBtu
|
$(-381.0) | ||
| TOTAL IMPLEMENTED | $4,133 | $4,594 |
$3,981
76,787
kWh
|
$533
-
MMBtu
|
$(-381.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs