ITAC Assessment: IA0027
ITAC logo
ITAC Assessment: IA0027
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product ATHLETIC UNIFORMS
NAICS
n/a
SIC 2329: Men's and Boys' Clothing, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 240
Plant Area
n/a
Annual Production 133,000
pieces
Production Hrs. Annual 4,420
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $38,859 748,535
kWh
Natural Gas $28,486 7,242
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,209 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,133

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2437: Recover waste heat from equipment $1,328 $1,297 - $1,328
-
MMBtu
-
02 2.2136: Install / repair insulation on steam lines $533 $361 - $533
-
MMBtu
-
03 2.2122: Install / repair insulation on condensate lines $191 $66 - $191
-
MMBtu
-
04 2.6232: Install set-back timers $2,643 $3,441 $2,643
50,996
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $274 $172 $655
12,603
kWh
- $(-381.0)
06 2.7111: Reduce illumination to minimum necessary levels $557 $250 $557
10,844
kWh
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $423 $600 $423
8,206
kWh
- -
08 2.4231: Reduce the pressure of compressed air to the minimum required $260 $20 $260
4,982
kWh
- -
TOTAL RECOMMENDED $6,209 $6,207 $4,538
87,631
kWh
$2,052
-
MMBtu
$(-381.0)
TOTAL IMPLEMENTED $4,133 $4,594 $3,981
76,787
kWh
$533
-
MMBtu
$(-381.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs