| Assessment Year | 2005 |
|---|---|
| Principal Product | Architectural millwork and fixtures |
| NAICS | 337215: Showcase, Partition, Shelving, and Locker Manufacturing |
| SIC | 2426: Hardwood Dimension and Flooring Mills |
| Sales Range | $5 M to 10M |
| # of Employees | 50 |
| Plant Area |
86,700
ft2
|
| Annual Production | 195
pieces
|
| Production Hrs. Annual | 2,860
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $30,787 | 905,520 |
kWh
|
$0.034 |
| Electricity Demand | $49,016 | 3,909 |
kW-mo/yr
|
$12.54 |
| Electricity Fees | $480 | - |
|
- |
| Natural Gas | $16,754 | 1,988 |
MMBtu
|
$8.43 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $24,750 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.2437: Recover waste heat from equipment | $2,890 | $4,100 | - | - |
$2,890
-
MMBtu
|
- | - | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,380 | $270 |
$460
12,700
kWh
|
$920
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $700 | $2,760 |
$230
6,500
kWh
|
$470
-
kW-mo/yr
|
- | - | - | |
| 04 | 2.2711: Utilize outside air instead of conditioned air for drying | $240 | $480 |
$80
2,200
kWh
|
$160
-
kW-mo/yr
|
- | - | - | |
| 05 | 2.7145: Install skylights | $10,440 | $90,000 |
$3,890
107,600
kWh
|
$6,020
-
kW-mo/yr
|
- | $200 | $330 | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,460 | $29,920 |
$2,590
71,800
kWh
|
$4,120
-
kW-mo/yr
|
- | $680 | $1,070 | |
| 07 | 2.7135: Install occupancy sensors | $640 | $960 |
$560
15,600
kWh
|
- | - | $30 | $50 | |
| TOTAL RECOMMENDED | $24,750 | $128,490 |
$7,810
216,400
kWh
|
$11,690
-
kW-mo/yr
|
$2,890
-
MMBtu
|
$910 | $1,450 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs