Assessment Year | 1985 |
---|---|
Principal Product | POLYETHYLENE FILM PRODUCTS |
NAICS |
n/a
|
SIC | 3083: Laminated Plastics Plate, Sheet, and Profile Shapes |
Sales Range | $10 M to 50M |
# of Employees | 112 |
Plant Area |
n/a
|
Annual Production | 45,000,000
lb
|
Production Hrs. Annual | 8,686
hrs
|
Location (State) | Louisiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $629,652 | 13,282,826 |
kWh
|
$0.047 |
Natural Gas | $40,620 | 8,646 |
MMBtu
|
$4.70 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $27,011 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,788 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7111: Reduce illumination to minimum necessary levels | $1,544 | - |
$1,544
37,515
kWh
|
- | |
02 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $3,879 | $8,181 |
$3,879
100,821
kWh
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,161 | $680 |
$3,161
74,736
kWh
|
- | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,403 | $139 |
$1,403
33,411
kWh
|
- | |
05 | 2.7261: Install timers and/or thermostats | $1,121 | $450 |
$725
18,757
kWh
|
$396
-
MMBtu
|
|
06 | 2.7261: Install timers and/or thermostats | $2,627 | $60 | - |
$2,627
-
MMBtu
|
|
07 | 2.2511: Insulate bare equipment | $5,430 | $1,840 |
$5,430
140,973
kWh
|
- | |
08 | 2.2515: Use optimum thickness insulation | $7,330 | $750 |
$7,330
190,211
kWh
|
- | |
09 | 2.4221: Install compressor air intakes in coolest locations | $516 | $100 |
$516
13,482
kWh
|
- | |
TOTAL RECOMMENDED | $27,011 | $12,200 |
$23,988
609,906
kWh
|
$3,023
-
MMBtu
|
||
TOTAL IMPLEMENTED | $10,788 | $9,371 |
$7,765
194,314
kWh
|
$3,023
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs