ITAC Assessment: UM0197
ITAC logo
ITAC Assessment: UM0197
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Oil control rails
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 201
Plant Area 127,000
ft2
Annual Production 30,000
ton
Production Hrs. Annual 7,200
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,111,033 46,386,708
kWh
Electricity Demand $287,929 33,732
kW-mo/yr
Electricity Fees $4,339 -
Natural Gas $300,368 66,473
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $85,893 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $64,713

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Primary Product Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $10,283 $21,862 $7,764
170,526
kWh
$2,519
-
kW-mo/yr
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,532 $825 $5,679
124,818
kWh
$1,853
-
kW-mo/yr
- - -
03 2.4221: Install compressor air intakes in coolest locations $2,898 $1,000 $2,189
48,052
kWh
$709
-
kW-mo/yr
- - -
04 2.2424: Use heat in flue gases to preheat products or materials $21,000 $60,000 - - - - $21,000
05 2.2511: Insulate bare equipment $180 $100 - - $180
-
MMBtu
- -
06 3.4151: Minimize water usage $44,000 $22,000 $4,663
104,015
kWh
$1,537
-
kW-mo/yr
- $37,800
-
Tgal
-
TOTAL RECOMMENDED $85,893 $105,787 $20,295
447,411
kWh
$6,618
-
kW-mo/yr
$180
-
MMBtu
$37,800
-
Tgal
$21,000
TOTAL IMPLEMENTED $64,713 $45,687 $20,295
447,411
kWh
$6,618
-
kW-mo/yr
- $37,800
-
Tgal
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs