Assessment Year | 2001 |
---|---|
Principal Product | Oil control rails |
NAICS |
n/a
|
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $10 M to 50M |
# of Employees | 201 |
Plant Area |
127,000
ft2
|
Annual Production | 30,000
ton
|
Production Hrs. Annual | 7,200
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $2,111,033 | 46,386,708 |
kWh
|
$0.046 |
Electricity Demand | $287,929 | 33,732 |
kW-mo/yr
|
$8.54 |
Electricity Fees | $4,339 | - |
|
- |
Natural Gas | $300,368 | 66,473 |
MMBtu
|
$4.52 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $85,893 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $64,713 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,283 | $21,862 |
$7,764
170,526
kWh
|
$2,519
-
kW-mo/yr
|
- | - | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,532 | $825 |
$5,679
124,818
kWh
|
$1,853
-
kW-mo/yr
|
- | - | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $2,898 | $1,000 |
$2,189
48,052
kWh
|
$709
-
kW-mo/yr
|
- | - | - | |
04 | 2.2424: Use heat in flue gases to preheat products or materials | $21,000 | $60,000 | - | - | - | - | $21,000 | |
05 | 2.2511: Insulate bare equipment | $180 | $100 | - | - |
$180
-
MMBtu
|
- | - | |
06 | 3.4151: Minimize water usage | $44,000 | $22,000 |
$4,663
104,015
kWh
|
$1,537
-
kW-mo/yr
|
- |
$37,800
-
Tgal
|
- | |
TOTAL RECOMMENDED | $85,893 | $105,787 |
$20,295
447,411
kWh
|
$6,618
-
kW-mo/yr
|
$180
-
MMBtu
|
$37,800
-
Tgal
|
$21,000 | ||
TOTAL IMPLEMENTED | $64,713 | $45,687 |
$20,295
447,411
kWh
|
$6,618
-
kW-mo/yr
|
- |
$37,800
-
Tgal
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs