| Assessment Year | 2001 |
|---|---|
| Principal Product | Oil control rails |
| NAICS |
n/a
|
| SIC | 3714: Motor Vehicle Parts and Accessories |
| Sales Range | $10 M to 50M |
| # of Employees | 201 |
| Plant Area |
127,000
ft2
|
| Annual Production | 30,000
ton
|
| Production Hrs. Annual | 7,200
hrs
|
| Location (State) | Michigan |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $2,111,033 | 46,386,708 |
kWh
|
$0.046 |
| Electricity Demand | $287,929 | 33,732 |
kW-mo/yr
|
$8.54 |
| Electricity Fees | $4,339 | - |
|
- |
| Natural Gas | $300,368 | 66,473 |
MMBtu
|
$4.52 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $85,893 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $64,713 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Primary Product Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,283 | $21,862 |
$7,764
170,526
kWh
|
$2,519
-
kW-mo/yr
|
- | - | - | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,532 | $825 |
$5,679
124,818
kWh
|
$1,853
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.4221: Install compressor air intakes in coolest locations | $2,898 | $1,000 |
$2,189
48,052
kWh
|
$709
-
kW-mo/yr
|
- | - | - | |
| 04 | 2.2424: Use heat in flue gases to preheat products or materials | $21,000 | $60,000 | - | - | - | - | $21,000 | |
| 05 | 2.2511: Insulate bare equipment | $180 | $100 | - | - |
$180
-
MMBtu
|
- | - | |
| 06 | 3.4151: Minimize water usage | $44,000 | $22,000 |
$4,663
104,015
kWh
|
$1,537
-
kW-mo/yr
|
- |
$37,800
-
Tgal
|
- | |
| TOTAL RECOMMENDED | $85,893 | $105,787 |
$20,295
447,411
kWh
|
$6,618
-
kW-mo/yr
|
$180
-
MMBtu
|
$37,800
-
Tgal
|
$21,000 | ||
| TOTAL IMPLEMENTED | $64,713 | $45,687 |
$20,295
447,411
kWh
|
$6,618
-
kW-mo/yr
|
- |
$37,800
-
Tgal
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Primary Product Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs