Assessment Year | 1988 |
---|---|
Principal Product | PIPE FITTINGS |
NAICS |
n/a
|
SIC | 3494: Valves and Pipe Fittings, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 50 |
Plant Area |
n/a
|
Annual Production | 84,246
pieces
|
Production Hrs. Annual | 2,500
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $44,289 | 696,073 |
kWh
|
$0.064 |
Natural Gas | $12,362 | 3,009 |
MMBtu
|
$4.11 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $4,562 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,673 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $301 | $159 |
$301
4,689
kWh
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $122 | $255 |
$122
1,758
kWh
|
- | - | |
03 | 2.2437: Recover waste heat from equipment | $302 | $420 | - |
$302
-
MMBtu
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $435 | - |
$545
14,947
kWh
|
- | $(-110.0) | |
05 | 2.7261: Install timers and/or thermostats | $1,766 | $1,040 | - |
$1,766
-
MMBtu
|
- | |
06 | 2.6232: Install set-back timers | $415 | $115 |
$415
6,155
kWh
|
- | - | |
07 | 2.7111: Reduce illumination to minimum necessary levels | $172 | $20 |
$172
2,638
kWh
|
- | - | |
08 | 2.7228: Avoid introducing hot, humid, or dirty air into hvac system | $717 | $380 |
$717
10,551
kWh
|
- | - | |
09 | 2.4239: Eliminate or reduce compressed air usage | $332 | $275 |
$332
9,086
kWh
|
- | - | |
TOTAL RECOMMENDED | $4,562 | $2,664 |
$2,604
49,824
kWh
|
$2,068
-
MMBtu
|
$(-110.0) | ||
TOTAL IMPLEMENTED | $3,673 | $2,264 |
$1,715
36,635
kWh
|
$2,068
-
MMBtu
|
$(-110.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs