ITAC Assessment: LT0010
ITAC logo
ITAC Assessment: LT0010
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product PAPER PACKAGING MACHINES
NAICS
n/a
SIC 3554: Paper Industries Machinery
Sales Range $5
M
to 10
M
# of Employees 101
Plant Area
n/a
Annual Production 27
pieces
Production Hrs. Annual 2,320
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $34,853 587,046
kWh
Natural Gas $24,435 3,834
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,076 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,720

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2511: Insulate bare equipment $157 $200 $157
2,638
kWh
-
02 2.2514: Cover open tanks $174 $48 $174
2,931
kWh
-
03 2.2532: Use only amount of air necessary to prevent explosion hazard $605 $74 - $605
-
MMBtu
04 2.7261: Install timers and/or thermostats $2,412 - $1,132
19,050
kWh
$1,280
-
MMBtu
05 2.4221: Install compressor air intakes in coolest locations $522 $400 $522
8,792
kWh
-
06 2.1321: Replace fossil fuel equipment with electrical equipment $751 $1,434 $(-453.0)
(-7,620)
kWh
$1,204
-
MMBtu
07 2.7142: Utilize higher efficiency lamps and/or ballasts $2,229 $573 $2,229
37,515
kWh
-
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $226 $321 $226
3,810
kWh
-
TOTAL RECOMMENDED $7,076 $3,050 $3,987
67,116
kWh
$3,089
-
MMBtu
TOTAL IMPLEMENTED $5,720 $1,542 $4,440
74,736
kWh
$1,280
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs