ITAC Assessment: LS2610
ITAC logo
ITAC Assessment: LS2610
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Ship Building
NAICS 336611: Ship Building and Repairing
SIC 3731: Ship Building and Repairing
Sales Range $10
M
to 50
M
# of Employees 64
Plant Area 67,525
ft2
Annual Production 156
units
Production Hrs. Annual 4,420
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $134,576 1,401,284
kWh
Electricity Demand $36,902 4,374
kW-mo/yr
LPG $6,941 145
MMBtu
Fuel Oil #2 $29,364 1,559
MMBtu
TOTAL YEARLY COSTS $207,783
RECOMMENDED SAVINGS* $48,722 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Administrative Changes Savings
01 2.7261: Install timers and/or thermostats $574 $50 $574
5,984
kWh
- - -
02 2.7211: Clean and maintain refrigerant condensers and towers $376 $94 $376
3,916
kWh
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,638 $1,703 $1,980
20,630
kWh
$658
-
kW-mo/yr
- -
04 2.1321: Replace fossil fuel equipment with electrical equipment $38,366 $192,732 $(-575.0)
(-5,990)
kWh
- $6,941
-
MMBtu
$32,000
05 2.4226: Use / purchase optimum sized compressor $6,768 $61,268 $6,768
70,499
kWh
- - -
TOTAL RECOMMENDED $48,722 $255,847 $9,123
95,039
kWh
$658
-
kW-mo/yr
$6,941
-
MMBtu
$32,000
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs