| Assessment Year | 1994 |
|---|---|
| Principal Product | electromechanical assembly and motor for timers |
| NAICS |
n/a
|
| SIC | 3625: Relays and Industrial Controls |
| Sales Range | $10 M to 50M |
| # of Employees | 270 |
| Plant Area |
200,000
ft2
|
| Annual Production | 1,750,000
pieces
|
| Production Hrs. Annual | 5,880
hrs
|
| Location (State) | Iowa |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $194,207 | 4,176,143 |
kWh
|
$0.047 |
| Natural Gas | $68,433 | 19,267 |
MMBtu
|
$3.55 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $19,973 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $8,682 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,862 | $1,656 |
$7,862
169,109
kWh
|
- | |
| 02 | 2.7135: Install occupancy sensors | $1,087 | $693 |
$1,087
23,447
kWh
|
- | |
| 03 | 2.4133: Use most efficient type of electric motors | $3,372 | $6,405 |
$3,372
72,392
kWh
|
- | |
| 04 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $2,687 | $8,790 |
$2,687
58,324
kWh
|
- | |
| 05 | 2.4221: Install compressor air intakes in coolest locations | $1,898 | $550 |
$1,898
40,739
kWh
|
- | |
| 06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $621 | $25 |
$621
13,482
kWh
|
- | |
| 07 | 2.3212: Optimize plant power factor | $1,520 | $5,265 |
$1,520
-
kWh
|
- | |
| 08 | 2.1233: Analyze flue gas for proper air/fuel ratio | $634 | $1,200 | - |
$634
-
MMBtu
|
|
| 09 | 2.1213: Direct warmest air to combustion intake | $171 | $20 | - |
$171
-
MMBtu
|
|
| 10 | 2.7447: Install vinyl strip / high speed / air curtain doors | $121 | $188 | - |
$121
-
MMBtu
|
|
| TOTAL RECOMMENDED | $19,973 | $24,792 |
$19,047
377,493
kWh
|
$926
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $8,682 | $14,133 |
$7,877
136,578
kWh
|
$805
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs