ITAC Assessment: IA0082
ITAC logo
ITAC Assessment: IA0082
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product electromechanical assembly and motor for timers
NAICS
n/a
SIC 3625: Relays and Industrial Controls
Sales Range $10
M
to 50
M
# of Employees 270
Plant Area 200,000
ft2
Annual Production 1,750,000
pieces
Production Hrs. Annual 5,880
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $194,207 4,176,143
kWh
Natural Gas $68,433 19,267
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,973 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,682

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $7,862 $1,656 $7,862
169,109
kWh
-
02 2.7135: Install occupancy sensors $1,087 $693 $1,087
23,447
kWh
-
03 2.4133: Use most efficient type of electric motors $3,372 $6,405 $3,372
72,392
kWh
-
04 2.2614: Use cooling tower or economizer to replace chiller cooling $2,687 $8,790 $2,687
58,324
kWh
-
05 2.4221: Install compressor air intakes in coolest locations $1,898 $550 $1,898
40,739
kWh
-
06 2.4231: Reduce the pressure of compressed air to the minimum required $621 $25 $621
13,482
kWh
-
07 2.3212: Optimize plant power factor $1,520 $5,265 $1,520
-
kWh
-
08 2.1233: Analyze flue gas for proper air/fuel ratio $634 $1,200 - $634
-
MMBtu
09 2.1213: Direct warmest air to combustion intake $171 $20 - $171
-
MMBtu
10 2.7447: Install vinyl strip / high speed / air curtain doors $121 $188 - $121
-
MMBtu
TOTAL RECOMMENDED $19,973 $24,792 $19,047
377,493
kWh
$926
-
MMBtu
TOTAL IMPLEMENTED $8,682 $14,133 $7,877
136,578
kWh
$805
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs