| Assessment Year | 2025 |
|---|---|
| Principal Product | Fittings and Flanges |
| NAICS | 333999: All Other Miscellaneous General Purpose Machinery Manufacturing |
| SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 75 |
| Plant Area |
296,756
ft2
|
| Annual Production | 500,000
pieces
|
| Production Hrs. Annual | 3,120
hrs
|
| Location (State) | Louisiana |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $167,818 | 1,644,300 |
kWh
|
$0.10 |
| Electricity Demand | $38,033 | 5,049 |
kW-mo/yr
|
$7.53 |
| Other Gas | $25,852 | 641 |
MMBtu
|
$40.33 |
| TOTAL YEARLY COSTS | $231,703 | |||
| RECOMMENDED SAVINGS* | $243,442 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Other Gas Savings | Administrative Changes Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7261: Install timers and/or thermostats | $13,009 | $225 |
$13,009
127,536
kWh
|
- | - | - | |
| 02 | 2.8117: Install sub-metering equipment | $3,354 | $3,000 |
$3,354
32,886
kWh
|
- | - | - | |
| 03 | 2.4224: Upgrade controls on compressors | $5,065 | $12,500 |
$5,065
49,654
kWh
|
- | - | - | |
| 04 | 2.7425: Clean or color roof to reduce solar load | $6,832 | $34,161 |
$6,832
66,980
kWh
|
- | - | - | |
| 05 | 2.1321: Replace fossil fuel equipment with electrical equipment | $87,705 | $481,830 |
$(-1,528.0)
(-14,976)
kWh
|
$9,233
-
MMBtu
|
$80,000 | - | |
| 06 | 2.9114: Use solar heat to make electricty | $45,568 | $526,500 |
$45,568
446,741
kWh
|
- | - | - | |
| 07 | 4.652: Replace existing equipment with more suitable substitutes | $81,909 | $1,200,000 |
$50,409
494,208
kWh
|
- | - | $31,500 | |
| TOTAL RECOMMENDED | $243,442 | $2,258,216 |
$122,709
1,203,029
kWh
|
$9,233
-
MMBtu
|
$80,000 | $31,500 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Other Gas Savings | Administrative Changes Savings | One-time Revenue or Avoided Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs