ITAC Assessment: MO0169
ITAC logo
ITAC Assessment: MO0169
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Clay/Alumina Brick/specialties
NAICS
n/a
SIC 3255: Clay Refractories
Sales Range $10
M
to 50
M
# of Employees 320
Plant Area 700,000
ft2
Annual Production 115,000
ton
Production Hrs. Annual 4,080
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $582,583 12,303,634
kWh
Electricity Demand $60,223 34,358
kW-mo/yr
Natural Gas $1,010,821 520,359
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $137,258 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $80,567

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.4133: Use most efficient type of electric motors $65,314 $178,547 $59,685
1,188,453
kWh
$5,629
-
kW-mo/yr
- -
02 2.2313: Use batch firing with kiln "furniture" specifically designed $27,170 $59,040 - - $27,170
-
MMBtu
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $6,379 $19,088 $5,795
115,475
kWh
$584
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $5,127 $5,193 $4,671
92,907
kWh
$456
-
kW-mo/yr
- -
05 2.4314: Use synthetic lubricant $3,747 $1,208 $3,424
68,288
kWh
$323
-
kW-mo/yr
- -
06 3.5311: Recover and reuse waste material $29,521 $90,000 - - - $29,521
-
lb
TOTAL RECOMMENDED $137,258 $353,076 $73,575
1,465,123
kWh
$6,992
-
kW-mo/yr
$27,170
-
MMBtu
$29,521
-
lb
TOTAL IMPLEMENTED $80,567 $204,036 $73,575
1,465,123
kWh
$6,992
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs