Assessment Year | 1996 |
---|---|
Principal Product | Clay/Alumina Brick/specialties |
NAICS |
n/a
|
SIC | 3255: Clay Refractories |
Sales Range | $10 M to 50M |
# of Employees | 320 |
Plant Area |
700,000
ft2
|
Annual Production | 115,000
ton
|
Production Hrs. Annual | 4,080
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $582,583 | 12,303,634 |
kWh
|
$0.047 |
Electricity Demand | $60,223 | 34,358 |
kW-mo/yr
|
$1.75 |
Natural Gas | $1,010,821 | 520,359 |
MMBtu
|
$1.94 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $137,258 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $80,567 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $65,314 | $178,547 |
$59,685
1,188,453
kWh
|
$5,629
-
kW-mo/yr
|
- | - | |
02 | 2.2313: Use batch firing with kiln "furniture" specifically designed | $27,170 | $59,040 | - | - |
$27,170
-
MMBtu
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,379 | $19,088 |
$5,795
115,475
kWh
|
$584
-
kW-mo/yr
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,127 | $5,193 |
$4,671
92,907
kWh
|
$456
-
kW-mo/yr
|
- | - | |
05 | 2.4314: Use synthetic lubricant | $3,747 | $1,208 |
$3,424
68,288
kWh
|
$323
-
kW-mo/yr
|
- | - | |
06 | 3.5311: Recover and reuse waste material | $29,521 | $90,000 | - | - | - |
$29,521
-
lb
|
|
TOTAL RECOMMENDED | $137,258 | $353,076 |
$73,575
1,465,123
kWh
|
$6,992
-
kW-mo/yr
|
$27,170
-
MMBtu
|
$29,521
-
lb
|
||
TOTAL IMPLEMENTED | $80,567 | $204,036 |
$73,575
1,465,123
kWh
|
$6,992
-
kW-mo/yr
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs