ITAC Assessment: OK0808
ITAC logo
ITAC Assessment: OK0808
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Paperboards
NAICS 322212: Folding Paperboard Box Manufacturing
SIC 2657: Folding Paperboard Boxes, Including Sanitary
Sales Range $50
M
to 100
M
# of Employees 200
Plant Area 230,000
ft2
Annual Production 1,200,000,000
pieces
Production Hrs. Annual 8,640
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $243,725 7,899,200
kWh
Electricity Demand $198,762 15,480
kW-mo/yr
Electricity Fees $39,618 -
Natural Gas $43,383 5,324
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $93,643 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $58,189

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7221: Lower temperature during the winter season and vice-versa $11,989 $1,776 - - $11,989
-
MMBtu
02 2.3137: Use power during off-peak periods $19,801 $226 $13,168
424,800
kWh
$6,633
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $8,547 $17,879 $5,651
183,202
kWh
$2,896
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,907 $5,105 $1,218
39,485
kWh
$689
-
kW-mo/yr
-
05 2.4226: Use / purchase optimum sized compressor $23,465 $16,400 $23,465
579,365
kWh
- -
06 2.7241: Install outside air damper / economizer on hvac unit $27,934 $5,125 $734
23,800
kWh
$1,528
-
kW-mo/yr
$25,672
-
MMBtu
TOTAL RECOMMENDED $93,643 $46,511 $44,236
1,250,652
kWh
$11,746
-
kW-mo/yr
$37,661
-
MMBtu
TOTAL IMPLEMENTED $58,189 $28,335 $20,771
671,287
kWh
$11,746
-
kW-mo/yr
$25,672
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs