ITAC Assessment: LS2420
ITAC logo
ITAC Assessment: LS2420
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Hardwood and Pine Lumber
NAICS 321999: All Other Miscellaneous Wood Product Manufacturing
SIC 2499: Wood Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 74
Plant Area 800,000
ft2
Annual Production 15,000
thousand feet
Production Hrs. Annual 2,080
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $227,794 4,079,250
kWh
Electricity Demand $258,640 18,948
kW-mo/yr
TOTAL YEARLY COSTS $486,434
RECOMMENDED SAVINGS* $70,692 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Increase in Production Savings
01 4.661: Level zero – install control systems for existing equipment $7,485 - - $7,485
02 2.7261: Install timers and/or thermostats $1,025 $25 $1,025
18,302
kWh
-
03 2.4131: Size electric motors for peak operating efficiency $16,356 $15,100 $16,356
292,081
kWh
-
04 2.4224: Upgrade controls on compressors $9,307 $21,000 $9,307
166,193
kWh
-
05 2.7425: Clean or color roof to reduce solar load $24,642 $68,828 $24,642
440,035
kWh
-
06 2.4145: Install isolation transformer on adjustable frequency drive $11,877 $51,800 $11,877
212,095
kWh
-
TOTAL RECOMMENDED $70,692 $156,753 $63,207
1,128,706
kWh
$7,485
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs